Items where Division is "Faculty of Engineering > Department of Industrial Engineering
Faculty of Engineering > Department of Industrial Engineering" and Year is 2009

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Creators | Item Type | No Grouping
Number of items: 283.

Article

., Sriyanto and Purwanggono, Bambang and Imam Nugroho, Pramudityo (2009) Perancangan Sistem Informasi Toko Emas. J@TI UNDIP, V (1). pp. 15-24. ISSN 1907 - 1434

Susanty, Aries (2009) PEMILIHAN MODEL ORGANISASI DAN TERWUJUDNYA PRINSIP-PRINSIP GOOD CORPORATE GOVERNANCE. J@TI UNDIP, IV (1). pp. 78-88. ISSN 1907 - 1434

., Sriyanto and Purwanggono, Bambang and Astuti, Dessy Tri (2009) Redisain Layout dan Prosedur untuk Reduksi Waktu Setup Gudang Komponen. J@TI UNDIP, IV (3). pp. 158-168. ISSN 1907 - 1434

., Subagyo and R.Wijaya, Andi and Susanto, Novie (2009) Analisis Karakteristik Produk Dan Pengaruh Pengetahuan Sebelumnya Dalam Proses Pembelajaran Perangkat Lunak Perkantoran. J@TI UNDIP, IV (1). pp. 42-51. ISSN 1907 - 1434

., Sutopo and ., Wahyudi (2009) Analisis Hubungan Antara Ketersediaan Pusat Informasi Dan Intensitas Publikasi Kegiatan Wisata Terhadap Kontribusi Ekonomi Sektor Periwisata. J@TI UNDIP, IV (1). pp. 52-59. ISSN 1907 - 1434

Adi , Purnawan and Saptadi, Singgih and Ratna , Mellina (2009) PENENTUAN PRODUCTION LOT SIZES DAN TRANSFER BATCH SIZES DENGAN PENDEKATAN MULTISTAGE. J@TI UNDIP, IV (2). pp. 131-141. ISSN 1907 - 1434

Arvianto, Ary and Prayudo, Sigit B. (2009) EVALUASI PENGARUH KONSTRUKSI MATERIAL, TINGKAT ISOLASI DAN SUHU LINGKUNGAN PADA SISTEM PEMANAS RUANGAN DENGAN MENGGUNAKAN SIMULASI KONTINYU. J@TI UNDIP, IV (2). pp. 114-121. ISSN 1907 - 1434

Azmi, Nora (2009) Penentuan Kriteria Fisik Pekerja Yang Sesuai Untuk Meningkatkan Produktivitas Kerja Pada Stasiun Blow Moulding Dengan Pendekatan Fisiologi Kerja (Studi Kasus PT ”X” Indonesia). J@TI UNDIP, V (1). pp. 25-32. ISSN 1907 - 1434

Bakhtiar, Arfan and Purwanggono, Bambang (2009) Analisis Implementasi Sistem Manajemen Kualitas ISO 9001:2000 Dengan Menggunakan GAP Analysis Tools (Studi Kasus di PT PLN (Persero) PIKITRING JBN Bidang Perencanaan). J@TI UNDIP, IV (3). pp. 185-193. ISSN 1907 - 1434

Bakhtiar, Arfan and Sriyanto, ST,MT and ., Amalia (2009) Analisa Faktor-Faktor Yang Mempengaruhi Pengembangan Kreativitas Industri Kerajinan Batik. J@TI UNDIP, IV (1). pp. 27-41. ISSN 1907 - 1434

Bakhtiar, Arfan and Purwanggono, Bambang (2009) Analisis Implementasi Sistem Manajemen Kualitas ISO 9001:2000 dengan Menggunakan GAP Analysis Tools Studi Kasus di PT PLN (Persero) PIKITRING JBN Bidang Perencanaan). J@TI UNDIP, IV (3). pp. 185-193. ISSN 1907 - 1434

Budi Puspitasari, Nia (2009) Simulasi Pelayanan Puskesmas Sandang Serang. J@TI UNDIP, IV (3). pp. 177-184. ISSN 1907 - 1434

Dewayana, Triwulandari S. and Budi , Ahmad (2009) Pemilihan Pemasok Cooper Rod menggunakan Metode ANP (Studi Kasus : PT. Olex Cables Indonesia (OLEXINDO)). J@TI UNDIP, IV (3). pp. 212-217. ISSN 1907 - 1434

Hartini, Sri and Larasati , Indria (2009) Pengendalian Persediaan Menggunakan Pendekatan Dynamic Inventory Dengan Mempertimbangkan Ketidakpastian Permintaan,Yield,dan Leadtime. J@TI UNDIP, IV (3). pp. 202-213. ISSN 1907 - 1434

Hartini, Sri and Prastawa , Heru and Jayaningtyas, Sitoarum (2009) Usulan Perbaikan Sistem Persediaan Untuk Minimasi Biaya Total Persediaan Pada PT. Semarang Autocomp Manufacturing Indonesia. J@TI UNDIP, V (1). pp. 55-66. ISSN 1907 - 1434

Hartini, Sri and Saptadi, Singgih and Kadarina, Nurlaila (2009) PENGENDALIAN LANTAI PABRIK DENGAN LOAD ORIENTED MANUFACTURING CONTROL PADA INDUSTRI MEBEL (STUDI KASUS PT “X”). TEKNIK, 30 (1). pp. 38-43. ISSN ISSN 0852-1697

Hartini, Sri and Saptadi, Singgih and Kadarina, Nurlaila and Rizkya, Indah (2009) ANALISIS PEMBOROSAN PERUSAHAAN MEBEL DENGAN PENDEKATAN LEAN MANUFACTURING (Studi Kasus PT “X” Indonesia). J@TI UNDIP, IV (2). pp. 95-105. ISSN 1907 - 1434

Hartini , Sri and Larasati, Indria (2009) Pengendalian Persediaan menggunakan Pendekatan Dynamic Inventory dengan mempertimbangkan Ketidakpastian Permintaan, Yield dan Leadtime. J@TI UNDIP, IV (3). pp. 202-211. ISSN 1907 - 1434

Herdiman, Lobes and Damayanti, Retno Wulan and Suletra, I Wayan (2009) Pemodelan Persamaan Newton-Euler pada Pengembangan Prosthetic Tangan Kosmetik dalam Menentukan Besarnya Daya pada Sistem Kabel External. J@TI UNDIP, IV (3). pp. 194-201. ISSN 1907 - 1434

Hetharia, Dorina (2009) PENERAPAN FUZZY ANALYTIC HIERARCHY PROCESS DALAM METODE MULTI ATTRIBUTE FAILURE MODE ANALYSIS UNTUK MENGIDENTIFIKASI PENYEBAB KEGAGALAN POTENSIAL PADA PROSES PRODUKSI. J@TI UNDIP, IV (2). pp. 106-113. ISSN 1907 - 1434

Karnita, Rosa and Meiralarasari, Della (2009) Metode Visual Interpretatif Terhadap Tampilan Visual Iklan Media Cetak Sebagai Alternatif Analisis Dari Metode Eye Tracking. J@TI UNDIP, V (1). pp. 33-40. ISSN 1907 - 1434

Nurkertamanda, Denny and Fanani, Zaenal and Kusuma, Anna (2009) PENERAPAN KEBIJAKAN PENJADWALAN ULANG PADA RUANG LINGKUP SINGLE MACHINE UNTUK MEMINIMASI TOTAL TARDINESS (Studi Kasus di PT. Indonesia Steel Tube Works). TEKNIK, 30 (2). pp. 110-118. ISSN ISSN 0852-1697

Nurkertamanda, Denny and Tri Wulandari, Fauziyati (2009) Analisa Moda Dan Efek Kegagalan(Failure Mode And Effects Analysis/FMEA)Pada Produk Kursi Lipat Chitose Yamato HAA. J@TI UNDIP, IV (1). pp. 60-77. ISSN 1907 - 1434

Nurkertamanda, Denny and Wirawan, Pandu (2009) USULAN KONSEP PENINGKATAN KEPUASAN PENGGUNA PERPUSTAKAAN DENGAN MENGGUNAKAN METODOLOGI LIBQUAL+™ DAN QUALITY FUNCTION DEPLOYMENT. J@TI UNDIP, IV (2). pp. 142-151. ISSN 1907 - 1434

P, Bambang and Hartini , Sri and Syaiful Anwar , Agus (2009) Perbaikan Kualitas Layanan Jasa Dengan Model Servqual Dimensi Kepariwisataan dan Metode Quality Function Deployment ( Studi kasus di PT X, Tempat Wisata Wahana Permainan). J@TI UNDIP, V (1). pp. 41-54. ISSN 1907 - 1434

Prastawa, Heru and Sriyanto, ST,MT and Suhalim, Monika (2009) Disain Sistem Database Order Produksi Pada Departemen Loom – Weaving 4, Divisi Denim PT Apac Inti Corpora. J@TI UNDIP, IV (1). pp. 1-9. ISSN 1907 - 1434

Puspita Sari, Diana (2009) Analisis Performansi Support Vector Regression Dalam Memprediksi Bonus Tahunan Karyawan. J@TI UNDIP, IV (1). pp. 17-26. ISSN 1907 - 1434

Puspitasari , Nia Budi (2009) Simulasi Pelayanan Puskemas Sadang Serang. J@TI UNDIP, IV (3). pp. 177-184. ISSN 1907 - 1434

Puspitasari , Nia Budi and Rinawati, Dyah Ika and Indriartiningtias, Retno (2009) PENGUKURAN KEPUASAN PELANGGAN COMLABS INSTITUT TEKNOLOGI BANDUNG (ITB). J@TI UNDIP, IV (2). pp. 89-94. ISSN 1907 - 1434

Rahman, Arief and Febrianto , Galih and Sudiarno, Adithya (2009) Perancangan Perangkat Lunak Untuk Pengukuran Waktu Kerja Menggunakan Teknologi Speech Recognition. J@TI UNDIP, V (1). pp. 7-14. ISSN 1907 - 1434

S. Dewayana, Triwulandari and Budi W , Ahmad (2009) Pemilihan Pemasok Cooper ROD Menggunakan Metode ANP (Studi Kasus : PT. Olex Cables Indonesia (OLEXINDO)). J@TI UNDIP, IV (3). pp. 212-217. ISSN 1907 - 1434

Saptadi, Singgih and Pritasari, Anggrila and Adi W, Purnawan (2009) Penentuan Kebijakan Pengiriman Menggunakan Model Persediaan Terintegrasi Untukn Perishable Product Dalam Supply Chain Multi-Eselon(Studi Kasus di Tika Bakery). J@TI UNDIP, V (1). pp. 67-76. ISSN 1907 - 1434

Septiani, Winnie (2009) Pendekatan Kombinasi Metode AHP Dan Metode Cut Off Point Pada Tahap Analisis Keputusan Perancangan Sistem Informasi Penjualan PT.X. J@TI UNDIP, IV (3). pp. 218-227. ISSN 1907 - 1434

Septiani, Winnie (2009) Pendekatan Kombinasi Metode AHP dan Metode Cut Off Point pada Tahap Analisis Keputusan Perancangan Sistem Informasi Penjualan PT.X. J@TI UNDIP, IV (3). pp. 218-227. ISSN 1907 - 1434

Sumadibrata, Hadi and Bin Mohd, Ismail (2009) (Q,r) Inventory System with Crashing Lead Time Condition. J@TI UNDIP, IV (1). pp. 10-16. ISSN 1907 - 1434

Susanty, Aries and Prastawa, Heru and Wahyuningsih, Yulia (2009) Evaluasi Kualitas Layanan Pembelajaran Dengan Menggunakan Konsep 4 D(Disconfirmation, Dissatisfaction, Dissonance, Disaffection)dan Pengaruhnya Terhadap Motivasi Belajar(Studi Kasus Program Studi XX). J@TI UNDIP, IV (3). pp. 228-238. ISSN 1907 - 1434

Susanty, Aries and Prastawa, Heru and Wahyuningsih, Yulia (2009) Evaluasi Kualitas Layanan Pembelajaran dengan Menggunakan Konsep 4 D(Disconfirmation, Dissatisfaction, Dissonance, Disaffection dan Pengaruhnya Terhadap Motivasi Belajar (Studi Kasus Program Studi XX). J@TI UNDIP, IV (3). pp. 228-238. ISSN 1907 - 1434

Widodo, Erwin (2009) Evaluasi Metode Pengadaan E-Commerce Dengan Memanfaatkan AHP. J@TI UNDIP, IV (3). pp. 169-176. ISSN 1907 - 1434

Widodo, Erwin (2009) Evaluasi Metode Pengadaan E-Commerce dengan Memanfaatkan AHP. J@TI UNDIP, IV (3). pp. 169-176. ISSN 1907 - 1434

Wiyono , Didiek Sri and Sutopo, Wahyudi (2009) PERANCANGAN MODEL DISTRIBUSI KOMODITAS PADI PASKA-PANEN BERBASIS SUPPLY CHAIN MANAGEMENT (Studi Kasus Sistem SAPA Sukabumi). J@TI UNDIP, IV (2). pp. 122-130. ISSN 1907 - 1434

Conference or Workshop Item

Bakhtiar, Arfan and Sriyanto, Sriyanto and Muslihin, Muhammad (2009) PENGUKURAN KUALITAS PRODUK & LAYANAN FLEXI TRENDY YANG BERPENGARUH TERHADAP CHURN DENGAN METODE CUSTOMER VALUE ANALYSIS (Studi Kasus di PT. TELKOM Divisi Regional IV Jawa Tengah & D.I.Yogyakarta). In: Seminar Nasional Teknologi Industri (SNTI) 2009, 5 Agustus 2009, Universitas Islam Sultan Agung Semarang Indonesia.

Prihandoyo, Ari Agung and Andreina, Winda and Nurkertamanda, Denny and Sriyanto, Sriyanto (2009) Analisa Pengaruh Keadaan Lingkungan Fisik dan Proses Produksi Terhadap Manajemen Pengelolaan K3 ( Studi Kasus Industri Plastik CV Sumber Agung Jawa Tengah ). In: 9th National Seminar Ergonomics, Patrajasa Hotel Semarang Indonesia.

Sriyanto, Sriyanto and Hartini, Sri (2009) PERANCANGAN SISTEM INFORMASI PENENTU RECEIVED DATE PADA SISTEM MANUFAKTUR REPETITIVE MAKE TO ORDER (STUDI KASUS DI PERUSAHAAN MEBEL). In: Seminar Nasional Teknologi Industri (SNTI) 2009, 5 Agustus 2009, Universitas Islam Sultan Agung Semarang Indonesia.

Monograph

Bachtiar, Arfan and Fanani, Zainal and Nurali, Didik (2009) PERENCANAAN KOMBINASI SHIFT PADA BAGIAN PRODUKSI CV. ANEKA ILMU MENGGUNAKAN INTEGER PROGRAMMING UNTUK MEMINIMALKAN BIAYA TENAGA KERJA. Technical Report. Diponegoro University. (Unpublished)

Bakhtiar, Arfan and Ambarwati, Neny (2009) DOKUMENTASI PROSES DI UNIT PERAKITAN INJECTION MOULDING MACHINE SEBAGAI PERSIAPAN PENERAPAN MACHINE SEBAGAI PERSIAPAN PENERAPAN SISTEM MANAJEMEN KUALITAS ISO 9001:2000 (Studi Kasus di PT. Mega Andalan Kalasan, Yogyakarta). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Bakhtiar, Arfan and Bakhtiar, Arfan and Wibowo, Hamal Dwi (2009) ANALISA WAKTU OPTIMAL PENGGANTIAN PENCEGAHAN KOMPONEN BERING PADA POMPA BONGSARI NO.2 DENGAN METODE AGE REPLACEMENT. Technical Report. Diponegoro University. (Unpublished)

Bakhtiar, Arfan and Pupitasari, Diana and Kridalelana, Suluh (2009) ANALISA KUALITAS JASA SERVIS SEPEDA MOTOR HONDA DENGAN METODE POTENTIAL GAIN IN CUSTOMER VALUE INDEX (Studi kasus di AHASS CAHAYA ABADI MOTOR SEMARANG). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Bakhtiar, Arfan and Santoso, Haryo and Fitriani, Vika (2009) PERANCANGAN PENGUKURAN KINERJA PERUSAHAAN DENGAN PENDEKATAN KONSEP BALANCED SCORECARD (STUDI KASUS PADA PT. XYZ). Technical Report. Diponegoro University. (Unpublished)

Hartini, Sri and Karima, Naela (2009) Perancangan Sistem Informasi Penentu Received Date Pada Sistem Manufaktur Repetitive Make To Order (Studi Kasus di Perusahaan Mebel). Technical Report. Faculty of Engineering, Semarang.

Hartini, Sri and Santoso, Haryo and Susanti, Retno (2009) ALTERNATIF METODE PERAMALAN DAN PENETUAN TINGKAT SAFETY STOCK UNTUK MENGURANGI RESIKO TERJADINYA STOCKOUT (Studi Kasus di PT. Sari Husada II, Tbk Kemudo Klaten). Technical Report. Diponegoro University. (Unpublished)

Hartini, Sri and Sriyanto, ST,MT and Rengganegoro, Adityo (2009) MAINTENANCE MAPPING PADA BAKING SECTION MESIN IMFORNI UNTUK MEMINIMASI BREAKDOWN DENGAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE (RCM) (Studi Kasus di PT. Nissin Biskuit Indonesia). Project Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Adi, Purnawan and Meridiani, Listya (2009) PERANCANGAN ULANG SISTEM DELIVERY SUPPLY (STUDI KASUS DI PT TOYOTA ASTRA MOTOR-ASSY PLANT). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Bakhtiar, Arfan and Nugroho, Novi Christiawan (2009) PENILAIAN DAN ANALISIS TEKNOLOGI SISTEM MANUFAKTUR DENGAN METODE ATLAS PROJECT. Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Fanani, Zaenal and Margaretha, Agustina (2009) PERANCANGAN SISTEM PENGUKURAN KINERJA DENGAN PENDEKATAN QUANTITATIVE MODELS FOR PERFORMANCE MEASUREMENT SYSTEM (QMPMS) (Studi Kasus di PT. Japfa Comfeed Indonesia Tbk). Project Report. Diponegoro University, Semarang. (Unpublished)

Nugroho, Susatyo and Fanani, Zainal (2009) PENGEMBANGAN SISTEM DAN PROSEDUR BAKU UNTUK MENUNJANG KELANCARAN PROSES PENERIMAAN ORDER PAKAIAN JADI DI PT. CERAH GARMINDO MANDIRI PERKASA. Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Fanani, Zainal and Citra, Meilani (2009) ANALISIS PENGGUNAAN KEBIJAKAN PEMERIKSAAN PERIODIK DALAM SISTEM PEMENUHAN PERSEDIAAN YANG TERKOORDINASI (Studi Kasus di PT. JasaMarina Indah – Semarang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nugroho, Susatyo and Fanani, Zainal and Sitompul, Agustina Margaretha (2009) PERANCANGAN SISTEM PENGUKURAN KINERJA DENGAN PENDEKATAN QUANTITATIVE MODELS FOR PERFORMANCE MEASUREMENT SYSTEM (QMPMS) (Studi Kasus di PT. Japfa Comfeed Indonesia Tbk). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Hartini, Sri and Akbar, Taufik (2009) USULAN METODE PERENCANAAN PRODUKSI DENGAN MEMPERTIMBANGKAN KONDISI KUANTITAS BAHAN BAKU (STUDI KASUS DI PT. SINAR BAHARI AGUNG DIVISI SURIMI). Project Report. Diponegoro University, Semarang. (Unpublished)

Nugroho, Susatyo and Hartini, Sri and Fitriani, Darina (2009) PENENTUAN INTERVAL WAKTU OPTIMAL BAGI PELAKSANAAN REPLCEMENT KOMPONEN KRITIS MESIN VETRACO (Studi Kasus pada Departemen Packing Bedak Padat PT. Martina Berto-Jakarta). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Hartini, Sri and Suksmono, Damas Adhi (2009) PERANCANGAN TATA LETAK PENYIMPANAN KOMPONEN BERDASARKAN FAKTOR KOMODITI KOMPONEN (Studi Kasus pada PT. Triangle Motorindo semarang). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Hartini, Sri and Wulandari, TI (2009) EVALUASI METODE PERSSEDIAAN BAHAN BAKU LAMPU FCL 32 W DAN 22 W (STUDI KASUS DI PT GE LIGHTING INDONESIA). Project Report. Diponegoro University, Semarang. (Unpublished)

Nugroho, Susatyo and Saptadi, Singgih and Indrayitno, Donny (2009) PENGEMBANGAN SISTEM INFORMASI PERKIRAAN TENGGAT WAKTU PRODUKSI (STUDI KASUS BENGKEL TJOKRO BERSAUDARA). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Saptadi, Singgih and Johanes, Leonard (2009) PENYEIMBANGAN LINTASAN PERAKITAN HOME THEATRE COMBI DENGAN MENGGUNAKAN PENDEKATAN ANALITIS-SIMULASI (Studi Kasus di PT LG Electronics Display Devices Indonesia). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nugroho, Susatyo and Saptadi, Singgih and Widiatmoko, Ariyadi (2009) PENGEMBANGAN SISTEM INFORMASI MANAJEMEN UNTUK MONITORING DEPARTEMEN PEMASARAN DAN PRODUKSI (Studi Kasus di PT. PISMA PUTRA TEXTILE). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Sriyanto, ST,MT and Adi, Tri (2009) PERANCANGAN SISTEM INFORMASI PERSEDIAAN SEBAGAI ALAT BANTU PENGENDALIAN PERSEDIAAN BERDASARKAN METODE MINIMAL STOK DAN ANALISIS ABC PADA STOK SUPERMARKET DAN GUDANG (STUDI KASUS DI SUPERMARKET SURYA BARU-PATI). Project Report. Diponegoro University, Semarang. (Unpublished)

Nugroho, Susatyo and Sriyanto, ST,MT and Andrianto, Noorman (2009) PEMBANGUNAN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU PT. NYONYA MENEER SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Sriyanto, ST,MT and Soenardi, Dwi Poernomo (2009) MINIMASI TRANSPORTATION WASTE DENGAN REDESAIN LAYOUT DAN PERALATAN MATERIAL HANDLING (Studi Kasus di PT Triangle Motorindo). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Suliantoro, Hery and Istiaji, Danang (2009) ANALISIS PENYEBAB CACAT DAN PENENTUAN ALTERNATIF PENYELESAIAN MASALAH PADA PROSES PRESS BODY MOBIL (Studi Kasus Pembuatan r/f Rocker Outer Daihatsu Xenia di Karoseri New Aramada Magelang). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Utami, Naniek and Agristina, Fitria (2009) ANALISIS PENGARUH KESALAHAN PERIKSA TERHADAP KINERJA RENCANA SAMLING PENERIMAAN (ACCEPTANCE SAMPLING PLAN. Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Utami, Naniek and Silitonga, Elisabeth (2009) ANALISIS FAKTOR-FAKTOR PENYEBAB NONCONFORMING KUALITAS FUNGSI PADA CM 140 “GUERLAIN” DENGAN METODE DISAIN EKSPERIMEN FAKTORIAL (Studi Kasus di PT. Technology Packaging Asia). Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Utami, Naniek and Sulistianawati, Anita (2009) EVALUASI ELEMEN-ELEMEN SIPOCOM PASCA IMPLEMENTASI SISTEM MANAJEMEN KUALITAS ISO 9001-2000 PADA PT ESPERA SATYA OFFSET. Technical Report. Diponegoro University. (Unpublished)

Nugroho, Susatyo and Utami, Naniek and Wibowo, Haneka Ari (2009) IDENTIFIKASI DAN USAHA PENINGKATAN KUALITAS PADA PEMBUATAN RODA CASTOR 5” MENGGUNAKAN METODE DPMO DAN PENGENDALIAN PROSES STATISTIK. Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and ., Sriyanto and Ismail, Ahmad Nur (2009) PENERAPAN METODE RETAD UNTUK MENGURANGI WAKTU SET UP PADA MESIN MILLING P1 DAN P2 DEPARTEMEN MACHINING DI PT. KUBOTA INDONESIA. Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Fanani, Zainal and Sari, Shinta Permata (2009) PENERAPAN SISTEM PENGUKURAN KINERJA DENGAN PENDEKATAN KONSEP BALANCE SCORECARD (Studi Kasus di PT INTI GENERAL YAJA INDONESIA). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Fanani, Zainal and Yanuardhi, Sonny Sandra (2009) MEMBANGUN SISTEM PENGUKURAN KINERJA PERUSAHAAN DENGAN MENGGUNAKAN FRAMEWORK BALANCED SCORECARD (Studi Kasus di Pos Express Semarang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Gunawan, Henry (2009) RANCANG BANGUN SISTEM INFORMASI APOTEK DENGAN METODE PROTOTYPING (Studi Kasus di APOTEK RUMAH SAKIT MUHAMMADIYAH SEMARANG). Project Report. Diponegoro University, Semarang. (Unpublished)

Nurkertamanda, Denny and Nurkertamanda, Denny and Wibowo, Novy Setyorini (2009) Penentuan Rute distribusi Menggunakan ZONE SKIPPING METHOD Untuk Meminimalkan Total Biaya Tranportasi Wilayah Jawa Tengah, Madiun dan Ponorogo (Studi Kasus di PT. CCBI Bawen). Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Dewi, Christine (2009) PENERAPAN METODE ALGORITMA GENETIK PADA PENJADWALAN FLOW SHOP UNTUK MEMINIMASI MAKESPAN (Studi Kasus di CV. Ciyra Indomebel). Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Marindra, Ongky (2009) PENGEMBANGAN KEBIJAKAN SISTEM PERSEDIAAN PARTS KACA UNIT MOC DENGAN KARAKTERISTIK DEMAND DYNAMIC PROBABILISTIC (Studi Kasus di PT. New Armada, Tbk – Magelang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Nofiana, Anita (2009) STANDARD OPERATING PROCEDURE KEGIATAN PERENCANAAN DAN PENGEMBANGAN PRODUK YANG MENGGUNAKAN METODE QFD (Studi Kasus di PT. Mega Andalan Kalasan, Yogyakarta). Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Puspasari, Dias Kiki (2009) IMPLEMENTASI METODE ICODE (INTEGRATED CONCEPT DEVELOPMENT) DALAM PERANCANGAN PRODUK ELECTRIC BED KAKI SILANG (STUDI KASUS DI PT. MEGA ANDALAN KALASAN-YOGYAKARTA). Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Sriyanto, . and Ismail, Ahmad Nur (2009) PENERAPAN METODE RETAD UNTUK MENGURANGI WAKTU SET UP PADA MESIN MILLING P1 DAN P2 DEPARTEMEN MACHINING DI PT. KUBOTA INDONESIA. Project Report. Diponegoro University, Semarang. (Unpublished)

Nurkertamanda, Denny and Sriyanto, ST,MT and Ismail, Ahmad Nur (2009) PENERAPAN METODE RETAD UNTUK MENGURANGI WAKTU SET UP PADA MESIN MILLING P1 DAN P2 DEPARTEMEN MACHINING DI PT. KUBOTA INDONESIA. Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Suliantoro, Hery and ., Winarno (2009) PERANCANGAN TATA LETAK PENYIMPANAN BAHAN BAKU SQUARE FOUR SIDE (S4S) BERDASARKAN KRITERIA KOMODITI (Studi Kasus Pada CV. Citra Indomebel Semarang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Suliantoro, Hery and P Y, Yoga (2009) PENERAPAN METODE SHIFTING BOTTLENECK HEURISTIC DALAM PENJADWALAN JOB SHOP M PARALLEL MACHINE (Studi Kasus di PT IGA ABADI). Technical Report. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Triwibowo, Prabandityo (2009) OPTIMALISASI WAKTU SIKLUS KERJA PADA LINI PERAKITAN DENGAN METODE TOYOTA PRODUCTION SYSTEM (Studi Kasus Pada Grup Shell Body, Body welding Line PT. XYZ). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Adi, Purnawan and Megawati, Kumala Retno (2009) EVALUASI DAN PERANCANGAN SISTEM KERJA LOADING/UNLOADING (TINJAUAN ASPEK : ERGONOMI) (Studi Kasus di PT Garuda Indonesia Airlines, Bandara Ahmad Yani, Semarang). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Bachtiar, Arfan and Tigor, Jobfi (2009) ANALISA FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PENYIMPANGAN POSISI PIN RING OP3 CYLINDER HEAD DENGAN METODE DISAIN EKSPERIMEN FAKTORIAL (Studi Kasus Astra Daihatsu Motor Engine Plant). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Bakhtiar, Arfan and Damayanti, Ira Sania (2009) OPTIMALISASI KOMBINASI PRODUK DENGAN MENGGUNAKAN METODE PROGRAM LINIER PADA CV CITRA JEPARA FURNITURE. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Bakhtiar, Arfan and Utaminingsih, Sri Widya (2009) USULAN PENJADWALAN FREKUENSI PERJALANAN BUS DAMRI DI SEMARANG UNTUK MEMINIMASI BIAYA OPERASIONAL. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Fanani, Zaenal and Ekawati, Yuni (2009) PENERAPAN METODE HEURISTIK DALAM PEMBENTUKAN CELLULAR MANUFACTURING LAYOUT. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Fanani, Zaenal and Giovanna, Brigitta (2009) PERANCANGAN SISTEM KERJA YANG ERGONOMIS PADA PENGANGKATAN KORAN KE DALAM MOBIL BOX DI PT. MASSCOM GRAPHY. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Fanani, Zaenal and Sukwadi, Ronald (2009) PERANCANGAN MACHINE CELL DI BENGKEL MESIN PLASTIK VARIA KEBUMEN DENGAN METODE ROC 2 DAN SIMULASI ARENA. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Fanani, Zaenal and Wibowo, Mugi (2009) PENERAPAN VALUE ENGINEERING DALAM EVALUASI PEMILIHAN JENIS MEDIA TRANSMISI PADA PROYEK PEMBANGUNAN SISTEM INFORMASI FAKULTAS TEKNIK (Studi Kasus di FAKULTAS TEKNIK UNVERSITAS DIPONEGORO). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Fanani, Zainal and Widayani, Indri Astuti (2009) Penilaian Teknologi dengan Metode Teknometrik di PT. Indo Acidatama Chemical Industry Solo. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Handayani, Naniek Utami and Nuryanti, TI (2009) ANALISIS FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP CACAT DALAM PADA PRODUK SLAB BAJA (STUDI KASUS DI SLAB STEEL PLANT-2 PT. KRAKATAU STEEL-CILEGON). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Handayani, Naniek Utami and Ragil, Romy (2009) PENGAMBILAN KEPUTUSAN PENGGANTIAN KOMPONEN BERDASARKAN UMUR PAKAI KOMPONEN MESIN PRODUKSI DI UNIT CRANK CASE (STUDI KASUS DI PT. KUBOTA INDONESIA). Project Report. Diponegoro University, Semarang. (Unpublished)

Prastawa, Heru and Hartini, Sri and Sadeli, Leyliana (2009) PENJADWALAN JOB SHOP DENGAN MENGGUNAKAN ALGORITMA HYBRID ACTIVE-NON DELAY SCHEDULE DENGAN MESIN PARALEL (Studi Kasus di Work Center Rough Mill PT. Maitland Smith Indonesia, Semarang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Maharani, Chatila (2009) USULAN PENGEMBANGAN TATA LETAK RUAN RUMAH BERSALIN MENJADI RUMAH SAKIT BERSALIN DENGAN MENGGUNAKAN CARC (Crisp Activity Relationship Chart). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Nugroho, Susatyo and Diahtantri, Felicia (2009) PENENTUAN JUMLAH PERSEDIAAN CYLINDER BLOCK DALAM RANGKA PENERAPAN SISTEM PRODUKSI TARIK PADA PT. ASTRA DAIHATSU MOTOR-ENGINE PLANT, JAKARTA. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Pujotomo, Darminto and Irawan, Riky (2009) PERANCANGAN TAHAP AWAL SISTEM KANBAN PADA AREA PRODUKSI PT. TRIANGLE MOTORINDO. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Pujotomo, Darminto and Sreshtho, Sistho aryo (2009) PERBAIKAN RANCANGAN SHELTER TELEPON UMUM (TINJAUAN ASPEK : ERGONOMIS). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Pujotomo, Darminto and Widiyati, Martini Ayu (2009) PENGENDALIAN KUALITAS PRODUK KACA BENING MENGGUNAKAN PENGENDALIAN PROSES STATISTIK DAN DESAIN EKSPERIMEN FAKTORIAL (Studi Kasus di PT. Tensindo Float Glass). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Rumondor, Bayront Yudit (2009) PERANCANGAN SISTEM INFORMASI PERSEDIAAN UNTUK MENDUKUNG PENILAIAN PERFORMANSI VENDOR (STUDI KASUS PT. ASTRA DAIHATSU MOTOR-ENGINE PLANT. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Rumondor, Bayront Yudit (2009) PERANCANGAN SISTEM INFORMASI PERSEDIAAN UNTUK MENDUKUNG PENILAIAN PERFORMANSI VENDOR (STUDI KASUS PT. ASTRA DAIHATSU MOTOR-ENGINE PLANT). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and ., Yanny (2009) ANALISIS BATCH PRODUKSI DENGAN PENDEKATAN HYBRID SIMULASI-ANALITIK (Studi Kasus di PT Dhemar Nusantara). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and Fajar, Daniel (2009) EVALUASI KINERJA JALAN RAYA DENGAN PENDEKATAN SIMULASI (Studi Kasus di Ruas Jalan Teuku Umar - Setiabudi). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and Ganjarwindu, Ananto (2009) SIMULASI MODEL ANTRIAN DYNAMIC SERVER (Studi Kasus di Bank BNI Cabang MT. Haryono Semarang). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and Kamal, Ali Khusni (2009) ANALISA MODA DAN EFEK KEGAGALAN SISTEM FOLDING BED (Studi Kasus di PT Mega Andalan Kalasan). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and Setiabudi, Arif (2009) PENYEIMBANGAN LINI PERAKITAN SEPEDA MOTOR TOSSA PRIMA SUPRA DENGAN MENGGUNAKAN PENDEKATAN HYBRID SIMULASI-ANALITIS (Studi Kasus di PT. TOSSA SHAKTI). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Saptadi, Singgih and Yudhotomo, Hari (2009) ANALISA MODA DAN EFEK KEGAGALAN ASSEMBLY RACHET PRODUK FOLDING BED. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Sriyanto, ST,MT and Niskala, Denis (2009) PERANCANGAN CELLULAR LAYOUT UNTUK MENGURANGI BACKTRACKING DAN MATERIAL HANDLING COST DEPARTEMEN PRODUKSI PT. ITU AIRCON. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Sriyanto, ST,MT and Opit, Prudensy (2009) EVALUASI KEBIJAKAN PEMESANAN DAN PENGEMBANGAN ALTERNASTIF MODEL PEMESANAN SUKU CADANG BERDASARKAN KRITERIA BIAYA (Studi Kasus di PT. Japfa Comfeed Indonesia,Tbk – Sidoarjo). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Sriyanto, ST,MT and Pratama, Hikma (2009) PERANCANGAN SISTEM INFORMASI AKADEMIK BERBASIS KOMPUTER (STUDI KASUS PROGRAM STUDI TEKNIK INDUSTRI UNDIP). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Sriyanto, ST,MT and Qodir, Abdul (2009) PENERAPAN KANBAN REQUEST TO VENDOR PADA DEPARTEMEN LOGISTIK SIDM PT INDONESIA EPSON INDUSTRY CIKARANG BEKASI. Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Suliantoro, Hery and Fadjar, Muchamad (2009) PENGALOKASIAN DAN PENENTUAN KEBUTUHAN OPERATOR PADA LAYOUT TIPE GROUP TECHNOLOGY MENGGUNAKAN METODE SIMULASI (Studi Kasus di PT. Maitland Smith Indonesia). Technical Report. Diponegoro University. (Unpublished)

Prastawa, Heru and Susanto, Novie (2009) ANALISIS ASPEK ANTHROPOMETRI, BIOMEKANIKA DAN FISIOLOGI PADA ALAT BANTU SIT-UP MERK “X”. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Utami, Naniek and Halibi, Mertikatiga (2009) IMPLEMENTASI METODE QUALITY FUNCTION DEPLOYMENT (QFD) DALAM UPAYA MENINGKATKAN KUALITAS KURSI LIPAT (Studi Kasus Pada Prototipe Kursi Lipat PT. Mega Andalan Kalasan Yogyakarta). Project Report. Diponegoro University, Semarang. (Unpublished)

Prastawa, Heru and Utami, Naniek and Saputro, Indra Hadi (2009) PENENTUAN PARAMETER PERMESINAN PADA PROSES PEMBUATAN DIAMETER LUAR KOMPONEN CRANK SAHFT DENGAN MENGGUNAKAN METODE TAGUCHI. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Prastawa, Heru and Utami, Naniek and Widiastuti, Catur (2009) PENERAPAN METODE TAGUCHI PADA MESIN CETAK TOKO 820 UNTUK MEMPERBAIKI KUALITAS CETAKAN (Studi Kasus di CV Cendrawasih). Technical Report. Diponegoro University. (Unpublished)

Pujotomo, Darminto and Hadi, Pamungkas (2009) PENENTUAN INTERVAL WAKTU PENGASAHAN YANG OPTIMAL DAN TINGKAT PERSEDIAAN CUTTER PADA MESIN CUP (Studi Kasus pada PT. Sumber Makmur Lov). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Pujotomo, Darminto and Suliantoro, Hery (2009) PERANCANGAN SISTEM PENGUKURAN KINERJA RUMAH SAKIT DENGAN METODE INTEGRATED PERFORMANCE MEASUREMENT SYSTEM (IPMS) (Studi Kasus Instalasi Bedah Sentral RSUD Dr. Soeselo Slawi). Project Report. Diponegoro University, Semarang. (Unpublished)

Pujotomo, Darminto and Suliantoro, Hery and Baskoro, Andityo Bagus (2009) PERANCANGAN SISTEM PENGUKURAN KINERJA RUMAH SAKIT DENGAN METODE INTEGRATED PERFORMANCE MEASUREMENT SYSTEM (IPMS) (Studi Kasus Instalasi Bedah Sentral RSUD Dr. Soeselo Slawi). Technical Report. Diponegoro University. (Unpublished)

Pujotomo, Darminto and Suliantoro, Hery and Iskandar, Yoga Maharseto (2009) ANALISIS PENGARUH POSTUR DAN PERSENTIL TUBUH PADA GAYA TEKAN (COMPRESSIVE FORCE) DI RUAS L5/S1 (LUMBOSACRAL) DALAM AKTIVITAS LIFTING MANUAL. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Pujotomo, Darminto and Suliantoro, Hery and Muhamad, Jaswin (2009) PENERAPAN ALGORITMA BROOKS PADA PROYEK DENGAN SUMBER DAYA TERBATAS (Studi Kasus di PT. REWULAN ABADI MANDIRI). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Pujotomo, Darminto and Wibowo, Dimas Aryo (2009) USULAN PERENCANAAN PRODUKSI (AGREGAT-DISAGREGAT ) UNTUK MENGANTISIPASI FLUKTUASI PERMINTAAN DAN MEMINIMALKAN BIAYA PRODUKSI (Studi kasus. PT. Cerah Garmindo Mandiri Perkasa Tekstil Semarang. Technical Report. Diponegoro University. (Unpublished)

Pujotomo, Darminto and Wibowo, Dimas Aryo (2009) USULAN PERENCANAAN PRODUKSI (AGREGAT-DISAGREGAT ) UNTUK MENGANTISIPASI FLUKTUASI PERMINTAAN DAN MEMINIMALKAN BIAYA PRODUKSI (Studi kasus. PT. Cerah Garmindo Mandiri Perkasa Tekstil Semarang). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Abud, Muchamad (2009) PERBAIKAN KUALITAS BODY BUS DENGAN METODE SIX SIGMA (STUDI KASUS PADA PT. LAKSANA KAROSERI). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Flonia, TI (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY DAN GARANSI UNTUKI SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Flonia, TI (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY DAN GARANSI UNTUKI SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Kurniawan, Nur Adi (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY UNTUK SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Zulianti, Rois (2009) OPTIMASI PEMOTONGAN BAHAN DUA DIMENSI DENGAN MENGGUNAKAN PROGRAM LINIER DI PT PORT RUSH SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Hastanto, Wahyu (2009) ANALISA KEBIJAKAN PERAWATAN PENGGANTIAN KOMPONEN BEARING COPPER PADA MESIN PLOUGHSHARE MIXER UNTUK MEMINIMASI DOWNTIME DAN BIAYA DI DEPARTEMEN KOSMETIK PT. KIMIA FARMA SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Nainggolan, Eva Paulina (2009) PENENTUAN JADWAL PENGANGKUTAN UNTUK MEMINIMASI PUNCAK SAMPAH DI KOTA SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Utami, Nining Dwi (2009) PERANCANGAN ULANG FASILITAS DAN METODE KERJA PADA STASIUN KERJA 1 SUB DEPARTEMEN LINE PERAKITAN MESIN DI PT. TRIANGLE MOTORINDO. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Adhi, R Yassin (2009) APLIKASI MODEL SIMULASI KOMPUTER UNTUK FASILITAS INSTALASI GAWAT DARURAT DI RUMAH SAKIT UMUM DAERAH UNGARAN. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Anggadira, Leo Dewanta (2009) PENERAPAN OBJECTIVE MATRIX (OMAX) DALAM PENGUKURAN PRODUKTIVITAS PADA BAGIAN PRODUKSI PT. PRASETYA INDRA BRATA. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Arvianto, Ary (2009) ANALISIS PERFORMANSI UNIT RAWAT JALAN R.S. TELOGOREJO SEMARANG DENGAN MENGGUNAKAN SIMULASI KOMPUTER. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Febbiyanto, Yussri (2009) PENENTUAN STAFFING LEVEL BERDASAR BEBAN KERJA MENGGUNAKAN SIMULASI (Studi Kasus di Sentral Pengolahan Pos Semarang 50400). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Jamaludin, TI (2009) OPTIMALISASI PRODUKSI PROSES PENGILANGAN BAHAN BAKAR MINYAK DENGAN MENGGUNAKAN PROGRAM LINEAR (STUDI KASUS DI PERTAMINA UNIT PENGOLAHAN VI BALONGAN). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Sidauruk, Adin (2009) USULAN PENILAIAN PRESTASI KERJA DI PT. SCANCOM INDONESIA. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Hartini, Sri and Ronny, TI (2009) PENERAPAN KONSEP PERENCANAAN DAN PENGENDALIAN PRODUKSI DENGAN MENGGUNAKAN METODE MRP PADA PT. LAKSANA KAROSERI. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Leksana, Charles Budi (2009) UPAYA PERBAIKAN PRODUKTIVITAS MENGGUNAKAN PENDEKATAN TOTAL PRODUCTIVITY MODEL (TPM) (Studi Kasus di PT SUMBER MAKMUR LOV). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Nugroho, Susatyo and Hendro, Hendro (2009) PERANCANGAN MACHINE CELL UNTUK PRODUKSI KOMPONEN TRUK PERKASA PADA DEPARTEMEN MACHINE SHOP DI PT. TEXMACO PERKASA ENGINEERING KALIWUNGU. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Nurkertamanda, Denny (2009) PERANCANGAN MEJA PENGUKURAN SEBAGAI FASILITAS PENDUKUNG PRAKTIKUM LABORATORIUM SISTEM PRODUKSI DENGAN METODE QUAD (Quality Usability and Assured Design). Project Report. Diponegoro University, Semarang. (Unpublished)

Purwanggono, Bambang and Nurkertamanda, Denny and Utomo, Chandra Wahyu (2009) PERANCANGAN DAN PEMBUATAN ALAT PELINDUNG MEJA MESIN FREIS PADA PENGGUNAAN PAHAT JENIS INSERT TOOLS UNTUK MEMENUHI KESELAMATAN KERJA. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Purnawan, Purnawan and Khamdani, Muhammad (2009) PENGGUNAAN MODEL MARKOV UNTUK PENGUKURAN KEANDALAN SISTEM (Studi Kasus Pada Mesin Produksi PT. ISTW Semarang. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Saptadi, Singgih and Alfinaldi, Indra (2009) STUDI PERFORMANSI SISTEM MANUFAKTUR JOB SHOP MENGGUNAKAN HYBRID LAYOUT DENGAN PENDEKATAN SIMULASI. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Saptadi, Singgih and Kardomo, K. (2009) PERANCANGAN SISTEM INFORMASI PERSEDIAAN BERBASIS KOMPUTER DI PT. JANSSEN INDONESIA – SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Saptadi, Singgih and Subekti, Yusti Harjanto (2009) ANALISA MODA DAN EFEK KEGAGALAN PROSES PRODUKSI SUBSISTEM SHRINKER PADA SHRINKING MACHINE (STUDI KASUS DI U.D. ALAT CEMPAKA NUSA). Project Report. Diponegoro University, Semarang. (Unpublished)

Purwanggono, Bambang and Saptadi, Singgih and Sumarta, Mohamad Agus (2009) PENGEMBANGAN SISTEM INFORMASI UNTUK PENGUKURAN PERFORMANSI PROYEK DENGAN METODE NILAI HASIL dan ANALISA VARIANSI PT. REKAYASA INDUSTRI (STUDI KASUS PADA PROYEK NPK MALAYSIA). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwanggono, Bambang and Sriyanto, ST,MT and Astuti, Dessy Tri (2009) REDUKSI WAKTU PENYIAPAN KOMPONEN DENGAN PENGATURAN ULANG TATA LETAK DAN PERBAIKAN PROSEDUR. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Sriyanto, ST,MT and Effendi, Firdaus (2009) PERANCANGAN SISTEM INFORMASI UNTUK MENDUKUNG PENJADWALAN PRODUKSI (STUDI KASUS PADA PT PANCA PRASETYA AGUNG). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Sriyanto, ST,MT and Effendi, Firdaus (2009) PERANCANGAN SISTEM INFORMASI UNTUK MENDUKUNG PENJADWALAN PRODUKSI (STUDI KASUS PADA PT PANCA PRASETYA AGUNG). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Suliantoro, Hery and Ernawaty, . (2009) ANALISIS PERFORMANSI DEPARTEMEN FINISHING PT ESPERA SATYA OFFSET SEMARANG DENGAN MENGGUNAKAN SIMULASI KOMPUTER DAN PENDEKATAN METODE PENJADWALAN (SEQUENCING). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Suliantoro, Hery and Pasaribu, Jahartap (2009) PENGUKURAN KINERJA PERUSAHAAN MENGGUNAKAN METODE INTEGRATED PERFORMANCE MEASUREMENT SYSTEMS (IPMS) Untuk Produk Mobil Tipe New Baleno (Studi Kasus PT. Indomobil Suzuki International Plant Tambun II). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Suliantoro, Hery and Wibisono, Ario Hestu (2009) USULAN PERBAIKAN KUALITAS UNTUK MENGATASI PROBLEM FINE BORING LONGGAR PADA DIVISI CRANK CASE PT YAMAHA INDONESIA MOTOR MANUFAKTURING. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Suliantoro, Hery and Wulandari, Rina Dyah (2009) USULAN PENJADWALAN PRODUKSI PADA PERUSAHAAN FURNITURE DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) (STUDI KASUS DI PT. ASRI KAJENG JAYA). Project Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Utami, Naniek and Siagian, Herdin (2009) APLIKASI METODE SIX SIGMA UNTUK PENINGKATAN KUALITAS PRODUK HOME THEATRE COMBI (HTC) MODEL LH-D SERIES (Studi Kasus di PT LG ELECTRONICS DISPLAY DEVICES INDONESIA). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Adi, Purnawan and Novita, Nora (2009) UPAYA PENINGKATAN PRODUKTIVITAS DENGAN METODE OBJECTIVE MATRIX (OMAX) PADA BAGIAN PRODUKSI DI PT. INDONESIA STEEL TUBE WORKS. Technical Report. Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Darmaji, Yusuf (2009) PERANCANGAN PRAKTIKUM ANALISIS METODE KERJA DENGAN IMPLEMENTASI MICROMOTION STUDY. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Hanggraini, Aji Dewi (2009) PERANCANGAN TATA LETAK PABRIK MENGGUNAKAN BLOCPLAN (Studi Kasus di PT. Nagasakti Furnindo Semarang). Project Report. Diponegoro University, Semarang. (Unpublished)

Purwaningsih, Ratna and Kuncara, Hari (2009) PENENTUAN PARAMETER PERMESINAN TERBAIK UNTUK MEMINIMASI PENYIMPANGAN GEOMETRI KESILINDRISAN BAUT SEGIENAM J-01 DENGAN METODE TAGUCHI (Studi Kasus di Bengkel Msin CV Laksana). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Kurniawan, Arif (2009) PERANCANGAN ULANG SISTEM KERJA PADA STASIUN PERAKITAN CRANKCASE DI PT. TRIANGLE MOTORINDO. Technical Report. Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Kusumawati, Endah (2009) PERANCANGAN METODE DAN ALAT BANTU PENGANGKATAN BATU BATA UNTUK MENGURANGI KONTRAKSI OTOT BAGI BURUH BANGUNAN WANITA. Technical Report. Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Marwansyah, Andrie (2009) USULAN PERBAIKAN SISTEM KERJA PADA LINI PERAKITAN INLET MANIFOLD UPPER DI PT. WIJAYA KARYA INTRADE. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Prasetyo, Daniel Agus (2009) PERANCANGAN FASILITAS FISIK DAN TATA LETAKNYA PADA RUANG KELAS TEKNIK INDUSTRI UNIVERSITAS DIPONEGORO DITINJAU DARI ASPEK ERGONOMI. Technical Report. Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Yuniatik, Indah (2009) PENGUKURAN BEBAN KERJA MENTAL PERAWAT SEBAGAI APLIKASI ERGONOMI KOGNITIF DENGAN METODE SWAT (STUIDI KASUS DI RUMAH SAKIT UMUM DAERAH BLORA). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and ., Sriyanto and Apriyani, Yunita (2009) PERANCANGAN DAN EVALUASI TATA LETAK UNIT PERAKITAN INJECTION MOULDING MACHINE DI PT. MEGA ANDALAN KALASAN YOGYAKARTA. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and A, Riko (2009) PERANCANGAN PROTOTIPE SISTEM PENDUKUNG KEPUTUSAN PENGENDALIAN PERSEDIAAN (STUDI KASUS DI PT MAITLAND – SMITH INDONESIA). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Adi, Purnawan and Dhani, TI (2009) PENERAPAN MODEL REPLACEMENT SYSTEM UNTUK MENENTUKAN INTERVAL WAKTU PENGGANTIAN MESIN ROLLER PADA PT SANGO CERAMICS INDONESIA DI SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Ardiyanto, Sidiq (2009) PENGUKURAN DAN ANALISIS KINERJA SUMBER DAYA MANUSIA PADA PERUSAHAAN DENGAN PENDEKATAN HUMAN RESOURCE SCORECARD (Studi Kasus di PT. MAJU JAYA FURINDO – KUDUS). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Bachtiar, Arfan and Fatimah, Laila Isnaina (2009) OPTIMALISASI PENGGUNAAN RUANG KELAS PLARIND BOULEVARD DENGAN PENDEKATAN PROGRAMA LINIER. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Bakhtiar, Arfan and Trismawati, Vina (2009) PERANCANGAN TATA LETAK DAN MATERIAL HANDLING BERDASARKAN KEBIJAKAN PENYIMPANAN PADA GUDANG BARANG JADI PT SAMPHARINDO PERDANA. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and Darminto, ST, MT and Mahfudi, Nurul (2009) ANALISIS FAKTOR-FAKTOR BERAT LAPISAN SENG UNTUK PRODUK BjLS KETEBALAN 0,2 MM DENGAN MENGGUNAKAN DESAIN FAKTORIAL 3K (Studi Kasus di Lini Produksi Sheet by Sheet PT Fumira). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zaenal and Komariah, Ainur (2009) PENENTUAN PERSEDIAAN SUKU CADANG MESIN DENGAN MEMPERTIMBANGKAN KEANDALAN (STUDI KASUS DI PT APAC INTI CORPORA). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Baehaqi, Waliyul Amiri (2009) ANALISIS KUALITAS PELAYANAN JASA TERHADAP KEPUASAN NASABAH DENGAN METODE IMPORTANCE PERFORMANCE ANALYSIS (Studi Kasus pada PT Bank Rakyat Indonesia (Persero) Tbk Cabang Weleri – Kendal). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Hartanto, Fransisca (2009) OPTIMASI PERENCANAAN PRODUKSI DENGAN METODE GOAL PROGRAMMING (Studi Kasus di PT Indonesia Steel Tube Works, Semarang). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Prasetyo, Apri Budi (2009) USULAN PEMILIHAN PEMASOK DENGAN METODE AHP (ANALYTICAL HIERARCHY PROCESS) DI PT. SCANCOM INDONESIA. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Romadhona, Erick (2009) ANALISIS PENGARUH PENERAPAN METODE HAY TERHADAP PRODUKTIVITAS PEGAWAI PT KRAKATAU WAJATAMA (Studi Kasus PT. Krakatau Wajatama, PT. KS Group). Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Satriyo, Hamdan (2009) PERBAIKAN PROSEDUR DAN PERANCANGAN SISTEM INFORMASI UNTUK MENUNJANG KELANCARAN PROSES PRODUKSI PAKAIAN JADI DI PT. CERAH GARMINDO MANDIRI PERKASA. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Satriyo, Hamdan (2009) PERBAIKAN PROSEDUR DAN PERANCANGAN SISTEM INFORMASI UNTUK MENUNJANG KELANCARAN PROSES PRODUKSI PAKAIAN JADI DI PT. CERAH GARMINDO MANDIRI PERKASA. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Syarifin, Yuniawan (2009) PENGEMBANGAN SISTEM INFORMASI UNTUK PROSES PENJADWALAN PRODUKSI(STUDI KASUS DI PT. TUPAI ADYAMAS INDONESIA). Project Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Hartini, Sri and Ginting, Rahmanta (2009) ANALISIS BEBAN KERJA MENTAL DOSEN TEKNIK ELEKTRO UNVERSITAS DIPONEGORO DENGAN METODE SUBJECTIVE WORKLOAD ASSESSMENT TECHNIQUE (SWAT. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and Hartini, Sri and Noor, Deny Zaniar (2009) PENERAPAN ALGORITMA FLEXIBLE FLOW LINE LOADING DALAM PENJADWALAN FLOW SHOP (Studi Kasus di CV CITRA INDOMEBEL). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Momongan, Ivan Andrew (2009) PENGEMBANGAN MODEL KUANTITATIF HIPOTETIS UNTUK PEMBUATAN PRODUCTION DELIVERY PLAN SESUAI KONSEP HEIJUNKA (Studi Kasus di PT. Astra Daihatsu Motor-Assy Plant). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Pujotomo, Darminto and Anurogo, Risang Pamungkas (2009) PERANCANGAN ULANG PRODUK TV BRACKET DALAM RANGKA PENGHEMATAN BIAYA DAN PENINGKATAN NILAI PRODUK DENGAN METODE REKAYASA NILAI ( VALUE ENGUNEERING) (Studi Kasus di PT Mega Andalan Kalasan Yogyakarta ). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Pujotomo, Darminto and Ardhiwibowo, Hamung (2009) PENINGKATAN METODE KONTROL JADUAL DALAM PROYEK PELABUHAN KABUPATEN KENDAL DENGAN MENGGUNAKAN METODE PROGRESS REPORT & S-CURVE (Studi Kasus Proyek Pelabuhan Kabupaten Kendal di PT Adhi Karya). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Pujotomo, Darminto and Gunawan, Aryc (2009) KORELASI ANTARA PEMBERIAN PREMI TERHADAP PENINGKATAN SEMANGAT KERJA KARYAWAN (Studi Kasus di PT. West Irian Fishing Industries). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Pujotomo, Darminto and Nugroho, Yunihar Ardhi (2009) ANALISIS KEBUTUHAN TENAGA KERJA BERDASARKAN METODA WORK LOAD ANALYSIS DAN WORK FORCE ANALYSIS (STUDI KASUS DEPARTEMEN BOTTOM PT. ARA SHOES UNGARAN JAWA TENGAH). Project Report. Diponegoro University, Semarang. (Unpublished)

Santoso, Haryo and Pujotomo, Darminto and Nursanti, Halimah (2009) ANALISIS PENGUKURAN PRODUKTIVITAS PADA CV. CITRA JEPARA FURNITURE. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Purwaningsih, Ratna and Prasetyojati, Sodiq (2009) OPTIMASI KOMBINASI JUMLAH PRODUK SENG DI PT. SEMARANG MAKMUR SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Purwaningsih, Ratna and Ratnasari, Dian (2009) PERANCANGAN SISTEM KERJA YANG ERGONOMIS PADA PROSES SORTASI BASAH DI BAGIAN PENGGILINGAN TEH HITAM ORTODOKS PTPN XII KEBUN WONOSARI MALANG. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Purwaningsih, Ratna and Wicaksono, Dananjaya (2009) PENGUKURAN DAN EVALUASI PRODUKTIVITAS DENGAN MENGGUNAKAN MODEL PRODUKTIVITAS TOTAL PADA CV. AMANDA GUMULUNG SEJAHTERA JAKARTA. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and Saptadi, Singgih and Saputra, Vino Harsaditya (2009) PERANCANGAN SISTEM INFORMASI GUDANG BERDASARKAN KRITERIA PENYIMPANAN KOMPONEN (Studi Kasus di PT. TOSSA SHAKTI). Project Report. Diponegoro University, Semarang. (Unpublished)

Santoso, Haryo and Satrio, Deny (2009) UPAYA PENINGKATAN EFISIENSI WAKTU STASIUN KERJA PADA LINTASAN PERAKITAN MELAUI ANALISA KESEIMBANGAN LINTASAN DI PT. TRIANGLE MOTORINDO. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Sriyanto, . and Ramana, Herry (2009) PENGEMBANGAN APLIKASI UNTUK EVALUASI MUTU AKADEMIK PADA SISTEM INFORMASI AKADEMIK TEKNIK INDUSTRI UNDIP. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Santoso, Haryo and Sriyanto, . and Riski, . (2009) ESTIMASI BIAYA GARANSI SEEDA MOTOR YAMAHA VEGA BERDASARKAN KEANDALAN KOMPONEN (Studi Kasus PT. YAMAHA INDONESIA MOTOR MFG). Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Sriyanto, ST,MT and Nugroho, Nur Cahyo (2009) PERANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK PENJADWALAN PRODUKSI BERDASARKAN KARAKTERISTIK PROSES PADA DIVISI PRODUKSI PT. SEMARANG MAKMUR. Technical Report. Diponegoro University. (Unpublished)

Santoso, Haryo and Yoga, Praditya (2009) ANALISA ERGONOMI KURSI KEMUDI DAN PERALATAN KONTROL UTAMA PADA MOBIL SEDAN EROPA DAN JEPANG (Studi Kasus pada Honda New City VTEC-Steermatic dan Volkswagen New Beetle 1.6L A/T). Technical Report. Diponegoro University. (Unpublished)

Saptadi, Singgih (2009) Pengembangan DSSMfgLib, Sebuah Manufacturing Simulation Engine dalam Perangkat Lunak Discrete Event Simulation DSSSim. Technical Report. Fakultas Teknik UNDIP. (Submitted)

Saptadi, Singgih and Ibrahim, Nanang (2009) PERANCANGAN ALAT BANTU PADA PROSES DRILLING UNTUK MENINGKATKAN PRODUKTIVITAS (STUDI KASUS DI INDUSTRI KECIL AGUNG BAROKAH). Technical Report. Diponegoro University. (Unpublished)

Saptadi, Singgih and Kusuma, Adhi Rah (2009) USULAN PERBAIKAN PERFORMANSI SISTEM ANTRIAN DI APOTEK VITRA SALATIGA. Technical Report. Diponegoro University, Diponegoro University. (Unpublished)

Sriyanto, Sriyanto and Pujotomo, Darminto and Octavian MP, Yogi (2009) Pengembangan Sistem Informasi Berbasis Komputer untuk Efisiensi dan Efektivitas Pakan pada Usaha Penggemukan Sapi Potong. Technical Report. Faculty of Engineering, Semarang.

Other

Adi W, Purnawan and ., Sandy (2009) Analisis dan Usulan Pengembangan User Interface Software Permainan Edukasi untuk Anak-Anak dengan Metode Luc (Logical User Centered Interaction Design) (Studi Kasus di SD Marsudirini Gedangan Semarang). Diponegoro University. (Unpublished)

Bachtiar, Arfan and Tri Putranto, Iwan (2009) Pengendalian Kualitas Metode Six Sigma Terintegrasi dengan ISO 9001:2000 (Studi Kasus pada Produk Tali Emas Spesial di PT. Sriboga Raturaya Semarang). Diponegoro University. (Unpublished)

Bakhtiar, Arfan and Pujotomo, Darminto and Ariefinardi, Denny (2009) Penjadwalan Proyek Pengembangan Produk Mesin Diesel dengan Integrasi Metode Dependency Structure Matrix dan Keterbatasan Tenaga Kerja (Studi Kasus : PT. Kubota Indonesia). Diponegoro University. (Unpublished)

Hartini, Sri and Larasati, Indria (2009) Studi Pengendalian Persediaan Menggunakan Pendekatan Dynamic Inventory dengan Mempertimbangkan Ketidakpastian Permintaan, Yield dan Leadtime (Studi Kasus Pada PT. Garudafood Putra Putri Jaya Pati). Diponegoro University. (Unpublished)

Hartini, Sri and Puspita Sari, Diana and Sulistyanto, Adhy (2009) Penerapan Model Persediaan dengan Pertimbangan Variabilitas Lead Time Material Methanol (Studi Kasus : PT. Pupuk Kalimantan Timur). Diponegoro University. (Unpublished)

Hartini, Sri and Rizkya T, Indah (2009) Manajemen Jig pada Departemen Chair Machinery untuk Meminimasi Waktu Set Up (Studi Kasus di PT. Maithland Smith Indonesia). Diponegoro University.

Hartini, Sri and Saptadi, Singgih and Kadarina, Nurlaila (2009) Pengendalian Lantai Pabrik dengan Load Oriented Order Release pada Lini Produksi Chair Machinery Department (Studi Kasus PT. Maitland Smith Indonesia). Diponegoro University. (Unpublished)

Hartini, Sri and Sriyanto, . and Kamal, Andrie Mustafa (2009) Penentuan Kebijakan Pemenuhan Pesanan dengan Model Vendor-Managed Inventory (Studi Kasus di PT Sampharindo Perdana -Semarang). Diponegoro University. (Unpublished)

Nugroho, Susatyo and Bachtiar, Arfan and Mariyani, Yuni (2009) PENENTUAN INTEERVAL WAKTU PENGGANTIAN PENCEGAHAN DAN FREKUENSI KEGIATAN PEMERIKSAAN DENGAN KRITERIA MINIMASI DOWNTIME (STUDI KASUS DI PT GE LIGHTING INDONESIA). Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Diana M, Fahma (2009) Perancangan Sistem Pemilihan dan Penentuaan Komposisi Warna Kemasan Pada Produk Kosmetik (perfume) dengan Aplikasi Kendali Logika Fuzzy. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Fanani Rosyada, Zaenal and Vitriana, Prihatin (2009) Perbaikan Tata Letak pada Gudang Bahan Baku Jamu (Studi Kasus : PT Leo Agung Raya Semarang). Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Putri K, Serena (2009) Klasifikasi ABC dan Kebijakan Pemesanan Multi-Item ( Studi Kasus di PT. Leo Agung Raya Semarang). Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Priyanto, Heru (2009) Rekayasa Perangkat Lunak Computer-Aided Process Planning untuk Mengurutkan Operasi Pemesinan pada Komponen Rotational. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Saptadi, Singgih and Widiotomo, R.Bagus (2009) PENGEMBANGAN SISTEM INFORMASI MANAJEMEN INVENTARIS LABORATORIUM SISTEM PRODUKSI. Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Sariwulan, Delta Indira (2009) Perancangan Tata Letak Penyimpanan Material di Gudang Transit (Studi Kasus di PT. Pantjatunggal Kniting Mill). Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Susanto, Novie and Ahman , Asen (2009) Pengembangan Desain Starting Block Kolam Renang Dengan Menggunakan Theory Of Inventive Problem Solving (TRIZ). Diponegoro University. (Unpublished)

Nurkertamanda, Denny and Wildansyah, Dellyar (2009) Penerapan Theory Of Inventive Problem Solving (TRIZ) dalam Perancangan Ruang Kelas TI 201. Diponegoro University. (Unpublished)

Prastawa, Heru and Adi, Purnawan and Pratiwi, Yuli (2009) PERANCANGAN MEJA KERJA LABORATORIUM ERGONOMI DAN PERANCANGAN SISTEM KERJA TEKNIK INDUSTRI UNDIP. Diponegoro University. (Unpublished)

Prastawa, Heru and Adi W, Purnawan and Rahayu , Indah Fitri (2009) Analisis Pengaruh Perbedaan Pencahayaan Ruangan, Jarak Pandang dan Brightness Layar Terhadap Kelelahan Visual dan Performansi pada Penggunaan Laptop. Diponegoro University. (Unpublished)

Prastawa, Heru and Adi W, Purnawan and Sugiyanti, Novi (2009) Analisis Produktivitas Proses Produksi menggunakan Fungsi Produksi Cobb-Douglas (Studi Kasus di PT Indonesia Steel Tube Works Semarang). Diponegoro University. (Unpublished)

Prastawa, Heru and Khairina, Rizky (2009) Penyusunan Data Anthropometri untuk Fasilitas Internasional. Diponegoro University. (Unpublished)

Prastawa, Heru and Nurul Komaryati, Momy (2009) Analisis Pengaruh Musik Usik dan Penggunaan Headphone Terhadap Performasi dan Kenyamanan Kerja Operator pada Pekerjaan Komputer (Studi Kasus : Mahasiswa Teknik Industri UNDIP). Diponegoro University. (Unpublished)

Prastawa, Heru and Pratiwi, Febriarini Candra (2009) Analisis Ergonomi dan Usulan Perbaikan Fasilitas Bermain Anak-Anak TK (Studi Kasus di TK Negeri Pembina, Boyolali). Diponegoro University. (Unpublished)

Prastawa, Heru and Purwaningsih, Ratna and Widhianti, Yulia (2009) PERANCANGAN CHAIR MOUNTED DENTAL UNIT DENGAN MENGGUNAKAN METODE QUAD (QUALITY AND USABILITY ASSURED DESIGN) DARI ASPEK ENTROPOMETRI (Studi Kasus di PT. Siaga Mitra Utama dental). Diponegoro University. (Unpublished)

Prastawa, Heru and Sriyanto, ST,MT and Hernadi, Apriliyanto (2009) Analisis Finansial untuk Pemilihan Trayek Bus Dalam Kota (Studi Kasus di PO. Bangkit Mulia). Diponegoro University. (Unpublished)

Prastawa, Heru and Taurena. D, Mayriska (2009) Analisis Ergonomi dan Usulan Perbaikan Fasilitas Belajar untuk Anak-Anak (Studi Kasus di TK Candi Baru Semarang). Diponegoro University. (Unpublished)

Prastawa, Heru and Utami Handayani, Naniek and Setya Umbara, Arif (2009) Perancangan Peralatan Pendukung Proses Produksi Genteng untuk Mengurangi Terjadinya Musculoskeletal Disorder (Studi Kasus di Industri Pembuatan Genting UD. Tanah Mas, Jepara, Jawa Tengah). Diponegoro University. (Unpublished)

Pujotomo, Darminto and Fanani , Zainal and Pamungkas, Febry Putera (2009) Perbaikan Sistem Evaluasi Performansi Kandidat Management Trainee (MT) Bidang Produksi Pada Tahap Wawancara dengan Metode AHP dan Fuzzy MCDM (Studi Kasus Departemen HRD, PT Indotirta Jaya Abadi). Diponegoro University. (Unpublished)

Pujotomo, Darminto and Karnaningsih, Siti (2009) Analisa Berat Beban pada Kuli Angkut dari Aspek Biomekanika (Studi Kasus Pada Kuli Angkut Pasar Beras Dargo Semarang ). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Adi W, Purnawan and Shodikin, Ali (2009) Perbaikan Mutu Produk Genteng melalui Perbaikan Bahan Baku (Studi Kasus di Perusahaan Genteng UD.Tanah Mas Jepara). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Choliq, Nur (2009) Perancangan Mesin Pengambil Ekstrak Jahe di PT. Ragam Jasa Indah. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Metasari, Nur (2009) Evaluasi Kinerja Fungsi Maintenance dengan Model Adapted Balanced Scorecard (Studi Kasus PT. Indotirta Jaya Abadi). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Paramita DS, Nandati (2009) Analisis Implementasi Sistem Manajemen Mutu ISO 9001:2000 dengan Menggunakan GAP Analysis Tools (Studi Kasus di PT PLN (Persero) PIKITRING JBN Bidang Perencanaan). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bakhtiar, Arfan and Sumunar, Tika (2009) Analisis Persiapan Dokumen Sistem Mutu dalam Rangka Sertifikasi ISO 9001:2000 (Studi Kasus PT. PLN (Persero) Unit Prokitring Jateng Dan DIY ). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Fanani, Zainal and Jatmiko, Agil Gandi (2009) Pengembangan Model Evaluasi Kinerja Pemasok dan Penentuan Pemilihan Pemasok Terbaik dengan Metode AHP dan Promethee II (Studi Kasus Pada Departemen Purchasing PT. SIMOPLAS SEMARANG). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Pujotomo, Darminto and Sudarno, TI (2009) PERENCANAAN PRODUKSI (AGREGAT-DISAGREGAT) UNTUK MKENETAPKAN KEBIJAKAN DALAM MENGANTISIPASI FLUKTUASI PERMINTAAN DAN MEMINIMALKAN BIAYA PRODUKSI (Studi Kasus PT. Industri Sandang Nusantara Cilacap). Diponegoro University. (Unpublished)

Purwanggono, Bambang and Pujotomo, Darminto and Wihadi, Anissa Nurkumalasari (2009) Analisis Faktor Penyebab Rendahnya Efektivitas Mesin Grinder di PT. Leo Agung Raya Semarang. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Sriyanto, ST,MT and Imam N, Pramudityo (2009) Perancangan Sistem Informasi Toko Emas (Studi Kasus di Toko Emas Semar). Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Nur Rohmah, Ita (2009) Analisis Pengaruh Shift, Umur dan Masa Kerja Terhadap Tingkat Kewaspadaan dengan Metode Quasa (Studi Kasus Di PTPN. IX (Persero) PG. Tasikmadu Karanganyar). Diponegoro University. (Unpublished)

Purwaningsih, Ratna and Suseno, Dedi (2009) Perancangan Prototype Alat Perajang pada Proses Perajangan Rambak Kulit (StudiKasusPadaUD.SumberBarokah,Boyolali). Diponegoro University.

Purwaningsih, Ratna and Tri Kuncoro W, Agung (2009) Perancangan Insentif Plan bagi Buruh Rokok Plan bagi Buruh inting Roko (Studi Kasus Pada Stasiun Pelintingan Rokok, PT. Gentong Gotri, Semarang). Diponegoro University. (Unpublished)

Santoso, Haryo and Fanani, Zainal and Kaawon, Abraham (2009) Analisis Motivasi Kerja dan Kepuasan Kerja Menggunakan Metode Minnesota Satisfaction Questionnare dan Job Diagnostic Survay PT. PLN (Persero) Distribusi Jawa Tengah dan DIY Jl. Teuku Umar No. 47 SEMARANG. Diponegoro University. (Unpublished)

Santoso, Haryo and Rosyada , Zanani Fanani and ., Musonef (2009) Penerapan Metode Green Productivity dalam Upaya Peningkatan Produktivitas (Studi Kasus : PT. Sido Muncul Bergas Semarang). Diponegoro University. (Unpublished)

Santoso, Haryo and Saptadi, Singgih and Benita K, Natasia (2009) Analisa Pengaruh Tarif dan Kualitas Terhadap Voluntary Churn Produk Flexi Trendy (Studi Kasus : PT. Telkom Wilayah Kota Semarang ). Diponegoro University. (Unpublished)

Saptadi, Singgih and Aisyiati, Fitria (2009) Analisis Kegagalan Proses Sanding Pada Produksi Plywood Menggunakan Root Causes Analysis (RCA) (Studi Kasus di PT. Kayu Lapis Indonesia ). Diponegoro University. (Unpublished)

Saptadi, Singgih and Gunawan, Aris (2009) Aplikasi Algoritma Ant Colony System (ACS)pada Penjadwalan Flow Shop Guna Meminimasi Makespan (Studi Kasus : CV. Citra Indomebel). Diponegoro University. (Unpublished)

Saptadi, Singgih and Kurniasari, Ika Estyrahayu (2009) Aplikasi Ant Colony Algorith dalam Pengoptimalan Jalur Distribusi dari Vendor ke Retailer. Diponegoro University. (Unpublished)

Saptadi, Singgih and Nurkertamanda, Denny and Dharma, Budi (2009) Pengembangan Educational Computer Game Pengenalan Angka. Diponegoro University. (Unpublished)

Saptadi, Singgih and Nurkertamanda, Denny and Supriyono, Agus (2009) Pengukuran Efektevitas dan Efisiensi Maintenance Planning and Scheduling Sales Gas Compreessor Solar Turbine Taurus T-60 di KF Platform kakap Field Star Energy (Kakap) LTD. Diponegoro University. (Unpublished)

Saptadi, Singgih and Sriyanto, . and Kahar, Alvin (2009) Perancangan Sistem Informasi Electronic Medical Record (EMR) Berbasis WEB untuk Membantu Diagnosa Pasien (Studi Kasus Pada RS Permata Medika Ngaliyan, Semarang). Diponegoro University. (Unpublished)

Saptadi, Singgih and Sriyanto, ST,MT (2009) Pengembangan Sistem pada Proses Source berdasarkan Metrik odel Supply Chain Operation Reference(SCOR) (Studi Kasus di PT Kubota Indonesia). Diponegoro University. (Unpublished)

Saptadi, Singgih and Sriyanto, ST,MT and Budiawan, Wiwik (2009) Pengembangan Sistem Pembelajaran Berbasis Internet(E-Learning) (Studi Kasus di Program Studi Teknik Industri Universitas Diponegoro). Diponegoro University. (Unpublished)

Saptadi, Singgih and Wijanarko, Dwi (2009) Perancangan Meja Adjustable dengan Memperhatikan Postur Kerja Pekerja Manual Material Handling (Studi Kasus di PT Coca-Cola Bottling Indonesia). Diponegoro University. (Unpublished)

Suliantoro, Hery and Adi, Purnawan and Sari, Kurnia (2009) Analisis Pengukuran Kinerja Pengadaan Menggunakan Metode Sink's Seven Performance Criteria (Studi Kasus : Pengadaan P2T Universitas Diponegoro Semarang Tahun 2007). Diponegoro University. (Unpublished)

Suliantoro, Hery and Fanani, Zainal and Chakim, Lukman (2009) Analisis Kemungkinan Pengembangan Potensi Hutan Pinus Rakyat menjadi Gondorukem Berbasis Kemitraan di Kabupaten Pekalongan. Diponegoro University. (Unpublished)

Suliantoro, Hery and Hapsari, Tharika (2009) Analisis Pengaruh Pemberian Perlakuan yang Berbeda-beda (Preferential Treatment) Terhadap Aspek-aspek Loyalitas\ Pelanggan (Studi Kasus: Layanan Rawat Inap Rumah Sakit Islam Klaten). Diponegoro University. (Unpublished)

Susanto, Novie and Dwitomo, Oktoriawan (2009) Analisis Pengaruh Perbedaan Postur Tangan Ukuran Mouse dan Jenis Kelamin Operator Terhadap Performansi pada Penggunaan Mouse Komputer (Studi Kasus : Mahasiswa Teknik Industri Undip). Diponegoro University. (Unpublished)

Susanty, Aries and Suliantoro, Hery and Himawan , Andri (2009) Analisis Hubungan Total Kualitas (5Q) dengan Loyalitas Konsumen Produk AMDK Aguaria (Studi Kasus di PT. Indotirta Jaya Abadi). Diponegoro University. (Unpublished)

Utami Handayani, Naniek and Bakhtiar, Arfan and Nugroyanto, Victory (2009) Analisis Kualitas Pelayanan Pendidikan Tinggi dengan Menggunakan Integrasi Metode Student Satisfaction Inventory dan Institutional Priorities Survey (Studi Kasus : Program Studi Teknik Industri Universitas Diponegoro). Diponegoro University. (Unpublished)

Utami Handayani, Naniek and Farida, Nur (2009) Analisis Pengaruh Penerapan dan Pengukuran Kinerja Eco-Efficiency pada Usaha Kecil Menengah (Studi Kasus UKM SE Batik Art & Painting, Laweyan Surakarta). Diponegoro University. (Unpublished)

Utami Handayani, Naniek and Henny Triana, Ariani (2009) Analisis Kualitas Pelayanan Jasa dengan Menggunakan Metode Servqual dan Analytical Hierarchy Process Process(AHP) (Studi Kasus pada Program Toefl Preparation di LBPP LIA Semarang). Diponegoro University. (Unpublished)

Wijaksona , Purnawan Adi and ., Suparyanti (2009) Pengembangan Interface Sistem Informasi Akademik Fakultas Teknik Undip Menggunakan Metode TCSD (Task - Centered System Design). Diponegoro University. (Unpublished)

Thesis

ANGGRAINI, DYAH KRISNA (2009) Analisis Mode Kegagalan Drop Call pada Telkom Flexi dengan Menggunakan Metode FMEA (Studi Kasus pada Divisi Fixed wireless Network RO Semarang PT. TELKOM, Tbk). Undergraduate thesis, Diponegoro University.

FAHMI, ENGGAR ALEFTORIA (2009) Perancangan Sistem Pengaman pada Sepeda Motor Menggunakan Theory Of Inventive Problem Solving (TRIZ). Undergraduate thesis, Diponegoro University.

HARRANI, KONSTANTIA (2009) Perancangan Manual dan Prosedur Mutu Proses Administrasi Akademis Berdasarkan ISO 9001:2008 dengan IDEF0 Analysis (Studi Kasus Di Program Studi Teknik Industri Universitas Diponegoro). Undergraduate thesis, Diponegoro University.

NUGROHO, BASKORO FAJAR (2009) Usulan Perbaikan Meja Pengepakan Bagian Produksi Koran dengan Metode QUAD(Studi Kasus di PT. MASSCOM GRAPHY SEMARANG. Undergraduate thesis, Diponegoro University.

AMALIA, AMALIA (2009) Analisa Faktor-faktor yang Mempengaruhi Pengembangan Kreativitas Industri Kerajinan Batik. Undergraduate thesis, Diponegoro University.

ANDRIYANI, ANDRIYANI (2009) Analisis Keterserapan Tenaga Kerja pada Industri Kecil di Wilayah Kabupaten Boyolali dengan Pendekatan Sistem Dynamic. Undergraduate thesis, Diponegoro University.

FLUXIANTO, LONTAR (2009) Perancangan Alat Pelontar Pancing Menggunakan Metode Value Engineering (VE). Undergraduate thesis, Diponegoro University.

KURNIAWAN, DWI NUGROHO (2009) Pengukuran Performansi Aktivitas Proyek Menggunakan Metode Earned Value Management Systems (EVMS) (Studi Kasus Proyek Penurapan Sheet Pile Tepi Sungai Selor, Kab. Bulungan, Kalimantan Timur, PT Hutama Karya). Undergraduate thesis, Diponegoro University.

KUSUMA JATI, AGENG (2009) Analisa Faktor-faktor Penyebab Kerugian Perusahaan Transportasi Menggunakan Integrasi Metode Manajemen Risiko Dengan Metode Analytic Hierarchy Process (AHP) dan Root Cause Analysis (RCA) (Studi Kasus di PO. Sumber Harapan). Undergraduate thesis, Diponegoro University.

NIRWANTO, ANDRI SOFYAN (2009) ANALISIS BEBAN KERJA PETUGAS PELAYANAN PEMBAYARAN REKENING LISTRIK PADA TANGGAL-TANGGAL SIBUK (Studi Kasus di PT. PLN UPJ SEMARANG TENGAH). Undergraduate thesis, Diponegoro University.

NOVITASARI, MAULIDA (2009) Analisis Tingkat Kepentingan Atribut Gangguan Telepon Rumah berdasarkan Preferensi Konsumen Menggunakan Metode Conjoint Analysis (Studi Kasus di PT. TELKOM Kandatel Semarang). Undergraduate thesis, Diponegoro University.

NURUSTA, FITRA (2009) Penyesunan Inspection Checklist K3 pada Area Maching Shop Line Crank Case dengan Metode JSA dan Hiraec (Studi Kasus di PT. KUBOTA INDONESIA). Undergraduate thesis, Diponegoro University.

POLANDA, MUTIARA DEWI (2009) Analisis Mode Kegagalan Potensial pada Proses Honing Komponen Cyclinder Liner RD 85 (ASM+ABS)dengan Menggunakan Metode FMEA (Studi Kasus di PT. KUBOTA INDONESIA). Undergraduate thesis, Diponegoro University.

Priandrani, Aldis (2009) Desain Perancangan pada Mini PC-GAME dengan menggunakan Metode User Centered Desaign (Studi Kasus pada Mahasiswa Teknik Industri UNDIP). Undergraduate thesis, Diponegoro University.

PUSPITASARI, DEWI (2009) Analisa Implementasi Malcolm Baldrige Criteria for Performance Excellence(MBCfPE)(Studi Kasus PT. Telkom Divre IV Jateng & DIY). Undergraduate thesis, Diponegoro University.

RASID, ARPI (2009) Analisa Pengaruh Kualitas Jasa terhadap Kepuasan Pelanggan dengan Menggunakan Analisis Korelasi Kanonik (studi kasus di PT.PLN (PERSERO) UPJ Semarang Tengah). Undergraduate thesis, Diponegoro University.

SETIAWAN, DANIEL (2009) Rekayasa Sistem Pembangkit Rencana Proses Pemesinan Generatif Berorientasi Objek untuk Part Rotasional. Undergraduate thesis, Diponegoro University.

This list was generated on Thu Dec 19 19:21:10 2024 WIT.