Items where Division is "Faculty of Engineering > Diploma in Mechanical Engineering
Faculty of Engineering > Diploma in Mechanical Engineering" and Year is 2015

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Creators | Item Type | No Grouping
Number of items: 54.

Abidin, Prihantoro Nur and Setyoko, Bambang and Mukhammad, Alaya Fadllu Hadi (2015) MODIFIKASI ALAT PERAGA PENGUKUR GETARAN PADA ALIGNMENT POROS MOTOR LISTRIK – GEARBOX – POMPA ( PERGESERAN KE SISI KANAN DAN SISI KIRI GEARBOX ) ( MODIFICATIONS VIEWER TOOL GAUGES VIBRATION IN ELECTRIC MOTOR SHAFT ALIGNMENT - GEARBOX - PUMPS ( SHIFT TO THE RIGHT SIDE AND LEFT SIDE GEARBOX )). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Adiguna, Indrawan Maulana and Murni, Murni (2015) RANCANG BANGUN LAS POTONG PORTABLE ( DESIGN OF PORTABLE WELDING MACHINE ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Akbar, Pandu and Rahmat, Rahmat and Atmanto, Ireng Sigit (2015) RANCANG BANGUN AIR CONDITIONING TEST-BED ( DESIGN OF AIR CONDITIONING TEST BED ). Undergraduate thesis, D3 Teknik Mesin.

Akbar , Moh. Doni and Rahmat, Rahmat and Sutrisno, Sutrisno (2015) PERENCANAAN DAN PEMASANGAN AIR CONDITIONING DI RUANG KULIAH C2 PSD III TEKNIK MESIN UNIVERSITAS DIPONEGORO SEMARANG ( PLANNING ANG INSTALLATION OF AIR CONDITIONING IN THE LECTURE ROOM C2 PSD III MECHANICAL ENGINEERING UNIVERSITAS DIPONEGORO ). Undergraduate thesis, D3 Teknik Mesin.

Anantanur, Devi and Mrihardjono, Juli (2015) PERHITUNGAN KINERJA PERPINDAHAN PANAS LOW PRESSURE HEATER 5 DAN 6 UNIT 1 PADA BEBAN 350 MW PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( HEAT TRANSFER PERFORMANCE CALCULATION OF LOW PRESSURE HEATER 5 AND 6 UNIT 1 ON 350 MW LOAD PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Ariyanto, Wisnu and Rahmat, Rahmat and Atmanto, Ireng Sigit (2015) RANCANG BANGUN AIR CONDITIONING TEST-BED ( DESIGN OF AIR CONDITIONING TEST BED ). Undergraduate thesis, D3 Teknik Mesin.

Budiharja, Yuniar Anis and Mangestiyono, Wiji (2015) AUDIT ENERGI TURBIN UAP UNIT 10 PT. PJB UBJ O & M PLTU REMBANG JAWA TENGAH DENGAN METODE HEAT RATE ( STEAM TURBINE UNIT 10 PT. PJB UBJ O & M PLTU REMBANG JAWA TENGAH ENERGY AUDIT WITH HEAT RATE METHOD ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Chaniago, Agung Setiawan Syahputra and Ariwibowo,, Didik (2015) RANCANG BANGUN PROTOTIPE ALAT PENGUPAS KULIT SINGKONG BERPENGGERAK MOTOR LISTRIK ( DESIGN OF CASSAVA PEELER PROTOTYPE WITH ELECTRIC MOTOR ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Faizal, Muhammad Afif and Atmanto, Ireng Sigit (2015) ANALISA UNJUK KERJA BELT CONVEYOR PLTU 1 JAWA BARAT INDRAMAYU ( PERFORMANCE ANALYSIS OF BELT CONVEYOR AT PLTU 1 JAWA BARAT INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fak. Teknik.

Fazabih, Muhamad Barhan and Sutrisno, Sutrisno (2015) ANALISA PERFORMA HIGH PRESSURE HEATER 1 PADA UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( PERFORMANCE ANALYSIS OF HIGH PRESSURE HEATER 1 AT UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Gusti, Amrisyah Pahlevi Setya and Setyoko, Bambang (2015) EVALUASI PERFORMA TURBIN UAP UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR DENGAN METODE HEAT RATE ( PERFORMANCE EVALUATION OF STEAM TURBINE UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR WITH HEAT RATE METHOD ). Undergraduate thesis, D3 Kerjasama PT. PLN - FT UNDIP Bidang Teknik Mesin.

Handrizal , Dinal and Setyoko, Bambang (2015) RANCANG BANGUN ALAT PERAGA PENGUKUR TEKANAN ( DESIGN BUILD VIEWER TOOL FOR MEASURING PRESSURE ). Undergraduate thesis, D3 Teknik Mesin.

Hanifah, Siti and Handayani, Sri Utami (2015) ANALISIS DISTRIBUSI KECEPATAN ALIRAN WIND TUNNEL TIPE TERBUKA ( VELOCITY DISTRIBUTION ANALYSIS OF OPEN JET WIND TUNNEL ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Haqni, Firdaus Kurniawan and Mangestiyono, Wiji (2015) OPTIMASI HEAT EXCHANGER TIPE PLATE CHEVRON DENGAN PEMBERSIHAN KERAK METODE CHEMICAL SPRAY PADA PLTU INDRAMAYU ( OPTIMIZATION OF CHEVRON PLATE TYPE HEAT EXCHANGER USING CHEMICAL SPRAY SCALE CLEANING METHOD IN PLTU INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Hardhiansyah , Irfan and Handayani, Sri Utami (2015) MODIFIKASI TEST BED SISTEM KOMPRESOR TORAK SATU TINGKAT ( MODIFICATION OF SINGLE STAGE RIECIPROCATING COMPRESSORE TEST BED ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Hutomo, Dimas Ferlindra and Murni, Murni (2015) ANALISA KEBUTUHAN UDARA UNTUK PEMBAKARAN SEMPURNA PADA BOILER UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( ANALYSIS OF AIR NEEDED FOR COMPLETE COMBUSTION IN UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Iswahyudi, Yanuar and Murni, Murni (2015) EVALUASI UNJUK KERJA AIR PREHEATER UNIT 2 PLTU 1 JAWA BARAT INDRAMAYU ( PERFORMANCE EVALUATION OF AIR PREHEATER UNIT 2 PLTU 1 JAWA BARAT INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Julianto, Helmi and Sutomo, Sutomo (2015) MESIN PENETAS TELUR BEBEK MENGGUNAKAN SOLAR SEL DAN MINYAK ( DUCK EGG INCUBATOR USING SOLAR CELLS AND OIL ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Kurniavip, Rizki and Indartono, Indartono (2015) EVALUASI KINERJA COOLING WATER HEAT EXCHANGER ( CWHE ) TIPE PLATE HEAT EXCHANGER ( PHE ) UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( PERFORMANCE EVALUATION OF COOLING WATER HEAT EXCHANGER (CWHE) PLATE TYPE HEAT EXCHANGERS (PHE) UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Kurniawan, Ganang Agung and Mukhammad, Alaya Fadllu Hadi (2015) RANCANG BANGUN MESIN CENTRIFUGAL CASTING HORIZONTAL UNTUK PENGECORAN ALUMINIUM SKALA LABORATORIUM ( DESIGN OF HORIZONTAL CENTRIFUGAL CASTING MACHINE TO LAB – SCALE ALUMINIUM CASTING ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Makhrus, Ainul and Setyoko, Bambang (2015) MODIFIKASI ALAT UJI BENDING SISTEM MEKANIK HIDROLIK DAN HASIL PENGUJIAN UNTUK BAHAN BESI COR ( MODIFICATION BENDING TEST EQUIPMENT HYDRAULIC AND MECHANICAL SYSTEMS TESTING RESULTS FOR CAST IRON MATERIALS ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Nugroho, Galih Satrio and Ariwibowo, Didik (2015) EVALUASI BILANGAN EXCESS AIR PADA VARIASI BEBAN UNIT 2 PLTU 1 JAWA BARAT INDRAMAYU ( EVALUATION OF THE NUMBER OF EXCESS WATER AT LOAD VARIATION 2 PLTU 1 JAWA BARAT INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Teknik Mesin Fakultas Teknik.

Nugroho , Wisnu Setyo and Atmanto, Ireng Sigit (2015) EVALUASI PERFORMA BOILER TYPE B & WB – 1050 / 18.44 – M UNIT 2 PLTU 1 JAWA BARAT INDRAMAYU PADA VARIASI BEBAN DENGAN METODE LANGSUNG ( BOILER TYPE B & WB - 1050 / 18:44 - M UNIT 2 PLTU 1 JAWA BARAT INDRAMAYU PERFORMANCE EVALUATION AT LOAD VARIATION WITH DIRECT METHOD ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin.

Pamungkas, Bayu and Handayani, Sri Utami (2015) ANALISA EFISIENSI ISENTROPIK TURBIN UAP PADA PLTU 1 JAWA BARAT INDRAMAYU ( ISENTROPIC EFFICIENCY ANALYSIS ON STEAM TURBINE PLTU 1 JAWA BARAT INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Prabowo, Aprianto Ady and Murni, Murni (2015) EVALUASI PENGARUH BEBAN TERHADAP EFISIENSI PADA BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG ( EVALUATION OF LOAD EFFECT ON EFFICIENCY OF THE BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Prahestu , Meghananda Dhenta and Setyoko, Bambang and Mukhammad, Alaya Fadllu Hadi (2015) MODIFIKASI ALAT PERAGA PENGUKUR GETARAN PADA ALIGNMENT POROS MOTOR LISTRIK – GEARBOX – POMPA ( PERGESERAN MOTOR LISTRIK KE SISI KANAN DAN SISI KIRI ) ( MODIFICATIONS VIEWER TOOL GAUGES VIBRATION IN ELECTRIC MOTOR SHAFT ALIGNMENT - GEARBOX - PUMP ( ELECTRIC MOTOR SHIFTS TO THE RIGHT SIDE AND LEFT SIDE )). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Prakoso, Bastiyan Aji and Setyoko, Bambang and Mukhammad, Alaya Fadllu Hadi (2015) MODIFIKASI ALAT PERAGA PENGUKUR GETARAN PADA ALIGNMENT POROS MOTOR LISTRIK – GEARBOX – POMPA ( PERGESERAN KE SISI KANAN DAN SISI KIRI POMPA ) ( MODIFICATIONS VIEWER TOOL GAUGES VIBRATION IN ELECTRIC MOTOR SHAFT ALIGNMENT - GEARBOX - PUMPS ( SHIFT TO THE RIGHT SIDE AND LEFT SIDE PUMPS )). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Pratama, Rafi Bayu and Sutomo, Sutomo (2015) PENGARUH REDESIGN MOTORIZED OPERATING VALVE ( MOV ) DEBRIS FILTER TERHADAP EFISIENSI PANAS CONDENSOR PLTU 1 JAWA BARAT INDRAMAYU ( EFFECT REDESIGN MOTORIZED OPERATING VALVE ( MOV ) DEBRIS FILTER OF EFFICIENCY HEAT CONDENSOR PLTU 1 JAWA BARAT INDRAMAYU ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin.

Pratomo, Memo Abdim and Handayani, Sri Utami (2015) ANALISA PERFORMA EFISIENSI BOILER FEED PUMP TURBIN UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( PERFORMANCE ANALYSIS OF EFFICIENCY BOILER FEED PUMP TURBINE UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fak. Teknik.

Premana, Maulana Ibrahim Azka and Sutomo, Sutomo (2015) ANALISA UNJUK KERJA KONDENSOR UNIT 1 TIPE N-16000-2 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( CONDENSER PERFORMANCE ANALYSIS UNIT 1 N-16000-2 TYPE PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Priambodo, Rio Bagus and Indartono, Indartono (2015) ANALISA EFISIENSI FORCED DRAFT FAN B UNIT #10 PT. PJB UBJ O & M PLTU REMBANG ( EFFICIENCY ANALYSIS OF FORCED DRAFT FAN B UNIT # 10 PT. PJB UBJ O & M REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Purnomosidi, Erwin and Mukhammad, Alaya Fadllu Hadi (2015) RANCANG BANGUN MESIN CENTRIFUGAL CASTING HORIZONTAL UNTUK PENGECORAN ALUMINIUM SKALA LABORATORIUM ( DESIGN OF HORIZONTAL CENTRIFUGAL CASTING MACHINE TO LAB – SCALE ALUMINIUM CASTING ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Putra, Arvin Kristian and Mukhammad, Alaya Fadllu Hadi (2015) RANCANG BANGUN MESIN CENTRIFUGAL CASTING HORIZONTAL UNTUK PENGECORAN ALUMINIUM SKALA LABORATORIUM ( DESIGN OF HORIZONTAL CENTRIFUGAL CASTING MACHINE TO LAB – SCALE ALUMINIUM CASTING ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Rahmat, Rahmat and Sutrisno, Sutrisno and Masrofiq, Ade (2015) PERENCANAAN DAN PEMASANGAN AIR CONDITIONING DI RUANG KULIAH C2 PSD III TEKNIK MESIN UNIVERSITAS DIPONEGORO SEMARANG ( PLANNING ANG INSTALLATION OF AIR CONDITIONING IN THE LECTURE ROOM C2 PSD III MECHANICAL ENGINEERING UNIVERSITAS DIPONEGORO ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Rahmat, Rahmat and Sutrisno, Sutrisno and Sayekti, Probo (2015) RANCANG BANGUN ALAT SIMULASI POMPA HUBUNGAN SERI DAN PARALEL ( ENGINEERING SIMULATION TOOLS OF SERIES AND PARALLEL CONNECTION PUMP ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Rossi, Rizka and Setyoko, Bambang (2015) ANALISA UJI VIBRASI PADA MOTOR DEMINERALIZED WATER PUMP A SEBAGAI INDIKASI MISALIGNMENT DI PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( VIBRATION TEST ANALYSIS ON DEMINERALIZED WATER PUMP A MOTOR AS A MISALIGNMENT INDICATION IN PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Saccharinda, Okiriawan and Handayani, Sri Utami (2015) MODIFIKASI TEST BED SISTEM KOMPRESOR TORAK SATU TINGKAT ( MODIFICATION OF SINGLE STAGE RIECIPROCATING COMPRESSORE TEST BED ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Santoso, Wahid Ma’sum and Ariwibowo, Didik (2015) SIMULASI PENGATURAN DAYA OUTPUT TERHADAP KEBUTUHAN BAKAR DAN ALIRAN UAP PADA PLTU 1 JAWA BARAT INDRAMAYU ( SIMULATION OUTPUT POWER SETTING TO COAL CONSUMPTION AND STEAM FLOW AT PLTU 1 JAWA BARAT INDRAMAYU COAL FIRED STEAM ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Teknik Mesin Fakultas Teknik.

Santoso, Yohanes Adi and Atmanto, Ireng Sigit (2015) ANALISA KINERJA HIGH PRESSURE HEATER #1 UNIT #20 DI PT. PJB UBJ O & M PLTU REMBANG ( PERFORMANCE ANALYSIS OF HIGH PRESSURE HEATER # 1 UNIT # 20 IN PT. PJB UBJ O & M REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fak. Teknik.

Saputra, Diantino Adi and Ariwibowo, Didik (2015) RANCANG BANGUN PROTOTYPE ALAT PENGUPAS KULIT SINGKONG BERPENGGERAK MOTOR LISTRIK ( DESIGN OF CASSAVA PEELER PROTOTYPE WITH ELECTRIC MOTOR ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Saputro, Widya Yuda and Ariwibowo, Didik (2015) RANCANGAN PISAU ROTARI UNTUK PEMOTONGAN SINGKONG DAN UJI PEMOTONGAN DENGAN ALAT BANTU PENGGERAK MOTOR LISTRIK ( THE DESIGN OF A ROTARY KNIFE FOR CUTTING CASSAVA AND TEST CUTTING TOOLS WITH ELECTRIC MOTORS ). Undergraduate thesis, D3 Teknik Mesin.

Sasmita, Aditya Mahendra and Mrihardjono, Juli (2015) PERHITUNGAN PERFORMA ALAT PENUKAR KALOR AIR PREHEATER A DAN B TIPE ROTARY LAP UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( PERFORMANCE CALCULATION OF HEAT EXCHANGER AIR PREHEATER A AND B TYPE ROTARY LAP UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

Setiawan, Kevin Aner and Murni, Mochammad (2015) RANCANG BANGUN LAS POTONG PORTABLE ( DESIGN OF PORTABLE WELDING MACHINE ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Setyoko, Bambang and Firdaus, Dony (2015) “RANCANG BANGUN MOBILE TANGKAS (TEMPAT PEMBUANGAN AKHIR SAMPAH BIOGAS)” ( DESIGN OF MOBILE AGILE (FINAL DISPOSAL WASTE BIOGAS)). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Setyoko, Bambang and D3 Teknik Mesin, Fak. Teknik (2015) PENGABDIAN KEPADA MASYARAKAT PROSEDUR PEMAKAIAN DAN KESELAMATAN KOMPOR GAS ELPIJI BAGI RUMAH TANGGA DI KELURAHAN PLEBURAN KECAMATAN SEMARANG SELATAN KOTA SEMARANG. [Image]

Sitompul, Kornelius Martua and Mangestiyono, Wiji (2015) RANCANG BANGUN TURBIN ANGIN SUMBU HORIZONTAL KAPASITAS 1000 WATT ( DESIGN OF HORIZONTAL AXIS WIND TURBINE AT 1000 WATTS CAPACITY ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Subekti, Ramdani Alfan and Mangestiyono, Wiji (2015) RANCANG BANGUN TURBIN ANGIN SUMBU HORIZONTAL KAPASITAS 1000 WATT ( DESIGN OF HORIZONTAL AXIS WIND TURBINE AT 1000 WATTS CAPACITY ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Triantoko, Rico and Bisri , Mahfud Adib and Isnaenudin, Fiki and Zulkarnain, Riky Johan and Baikhaky, Aby Al and Setyoko, Bambang (2015) RANCANG BANGUN MESIN PENCACAH BOTOL PLASTIK ( DESIGN COUNTING MACHINES PLASTIC BOTTLES ). Undergraduate thesis, D3 Teknik Mesin.

Wibowo, Ari Eko Prasetiyo and Rahmat, Rahmat (2015) RANCANG BANGUN ULANG ALAT UJI SISTEM KOMPRESOR TORAK SATU TINGKAT ( RE-DESIGN SYSTEM TEST EQUIPMENT OF SINGLE STAGE PISTON COMPRESSOR ). Undergraduate thesis, D3 Teknik Mesin.

Wijayanta, Febri and Muhibin, Ayi Wiguna and Putra, Ardyansyah Hamidoni and Kurniawan, Yuli and Pujianto , Arif and Murni, Moch and Atmanto, Ireng Sigit (2015) RANCANG BANGUN KENDARAAN OPERASIONAL RUMAH SAKIT DENGAN BEBAN MAKSIMAL 120 KG ( DESIGN OF OPERASIONAL VEHICLES HOSPITALS WITH A MAXIMUM LOAD OF 120 KG ). Undergraduate thesis, D3 Teknik Mesin.

Yogatama, Marga and Sutrisno, Sutrisno (2015) EVALUASI PENGARUH PENGGUNAAN BATUBARA LOW RANK TERHADAP KINERJA UNIT #20 PLTU REMBANG DITINJAU DARI NET PLANT HEAT RATE ( EVALUATION OF THE EFFECT OF THE USE OF LOW – RANK COAL TO THE POWER PLANT’S PERFORMANCE IN TERMS OF NET PLANT HEAT RATE AT UNIT #20 PLTU REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Yusuf , Bakharuddin and Mrihardjono, Juli (2015) ANALISA EFISIENSI PRIMARY AIR FAN A UNIT #10 PADA PT. PJB UBJ O & M PLTU REMBANG ( EFFICIENCY ANALYSIS OF PRIMARY AIR FAN A UNIT # 10 AT PT. PJB UBJ O & M REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.

Zaenuri , Mohamad and Murni, Murni (2015) RANCANG BANGUN LAS POTONG PORTABLE ( DESIGN OF PORTABLE WELDING MACHINE ). Undergraduate thesis, D3 Teknik Mesin Fakultas Teknik.

Zulfika , Riska Yudha and Mukhammad, Alaya Fadllu Hadi (2015) ANALISA UNJUK KERJA BOILER FEED PUMP TERHADAP TURBINE HEAT RATE DI PT PJB UBJ O&M PLTU REMBANG UNIT 10 ( PERFORMANCE BOILER FEED PUMP TO TURBINE HEAT RATE PT PJB UBJ O&M PLTU REMBANG UNIT 10 ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

This list was generated on Sat Apr 27 02:35:27 2024 WIT.