EVALUASI PENGARUH BEBAN TERHADAP EFISIENSI PADA BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG ( EVALUATION OF LOAD EFFECT ON EFFICIENCY OF THE BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG )

Prabowo, Aprianto Ady and Murni, Murni (2015) EVALUASI PENGARUH BEBAN TERHADAP EFISIENSI PADA BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG ( EVALUATION OF LOAD EFFECT ON EFFICIENCY OF THE BOILER UNIT 10 PLTU 1 JAWA TENGAH REMBANG ). Undergraduate thesis, D3 Kerjasama PT. PLN bidang Teknik Mesin.

[img]
Preview
PDF
63Kb
[img]
Preview
PDF
27Kb
[img]
Preview
PDF
599Kb
[img]
Preview
PDF
4Mb
[img]PDF
Restricted to Repository staff only

819Kb
[img]
Preview
PDF
39Kb

Abstract

Pada PLTU salah satu peralatan yang penting adalah boiler, apabila unjuk kerja boiler menurun maka unjuk kerja dari pembangkit juga akan menurun. Oleh sebab itu perlu adanya Overhaul boiler secara berkala di PLTU Rembang.Over haul diharapkan agar suatu peralatan atau mesin dapat beroperasi dengan handal, aman kesiapan yang tinggi dengan unjuk kerja baik sesuai dengan umur peralatan. Dengan unjuk kerja boiler yang baik maka dapat menghasilkan daya secara maksimal. Dari hasil perhitungan pada beban berbeda dengan menggunakan metode langsung (direct) didapatkan bahwa effisiensi tertinggi pada Boiler Unit #10 PLTU 1 Jawa Tengah Rembang sebelum Overhaul Simple Inspection yaitu sebesar 77,69% dan setelah Overhaul Simple Inspection effisiensi didapatkan sebesar 80,22%. Rata-rata kenaikan effisiensi sebesar 2,04%. Dengan adanya kenaikan effisiensi maka Overhaul Simple Inspection yang dilakukan oleh PLTU Rembang dapat dikatakan berhasil. Dari hasil perhitungan sebaiknya boiler dioperasikan pada kondisi beban 315 MW karena effisiensi dari boiler tinggi dibanding pada kondisi beban yang lain, selain itu dengan effisiensi boiler yang tinggi dapat menghemat dari segi biaya produksi. dalam kenyataannya untuk beban puncak pada boiler unit 10 PLTU 1 Jawa Tengah Rembang untuk saat ini hanya pada kondisi beban 300 MW hal ini dipengaruhi oleh permintaan P3B sebagai penyalur energi listrik ke konsumen. Kata kunci :Effisiensi, Boiler, Overhaul One of the important equipments in the Power Plant is a boiler. Decreasing boiler performance causes decreasing performance of the power plant. Thus, maintenance and overhaul are periodically needed in Power Plant Boiler 1 Central Java. Being overhauled, an equipment or machine is expected to have high reliability, safety and readinesswith a good performance according to age of the equipment. The good performance of the boiler will produce maximum power. Results of calculations using direct method shows that Boiler Unit 10 PLTU 1 Central Java Rembanghas the highest efficiency; before Simple Inspection Overhaulof 77.69% and after Simple Inspection Overhaulfound efficiency of 80.22% . The average of efficiency is 2.04%. The increasing efficiency indicates that Simple Inspection Overhaul performed by Power Plant Rembang was successful. Based on the calculation Boilers should be operated at 315 MW load conditions due to its highest efficiency compared when operated in other conditions. The high efficiency of the boiler could also save production cost. In fact, at the moment, the boilers in unit 10 Central Java Power Plant 1 have the peak load of 300 MW. It is influenced by the demand in P3B as electrical energy supplier to the consumer. Keywords: Efficiency, Boiler, Overhaul

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TJ Mechanical engineering and machinery
Divisions:Faculty of Engineering > Diploma in Mechanical Engineering
Faculty of Engineering > Diploma in Mechanical Engineering
ID Code:47325
Deposited By:INVALID USER
Deposited On:11 Jan 2016 08:32
Last Modified:11 Jan 2016 08:32

Repository Staff Only: item control page