Items where Division is "School of Postgraduate (mixed) > Master Program in Civil Engineering" and Year is 2010

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Creators | Item Type | No Grouping
Jump to: Thesis
Number of items: 13.

Thesis

KISTIANI, FRIDA (2010) OPTIMISASI PENDANAAN PROYEK DENGAN TEKNIK PEMROGRAMAN LINIER (Studi Kasus : Proyek-proyek dengan Kontrak Unit Price). Masters thesis, UNIVERSITAS DIPONEGORO.

Arianto, Ari f and Wibowo, Agung and Utomo, Jati (2010) EKSPLORASI METODE BAR CHART, CPM, PDM, PERT, LINE OF BALANCE DAN TIME CHAINAGE DIAGRAM DALAM PENJADWALAN PROYEK KONSTRUKSI. Masters thesis, magister teknik sipil.

BAKTI, L. M. (2010) KAJIAN SEBARAN POTENSI ROB KOTA SEMARANG DAN USULAN PENANGANANNYA. Masters thesis, magister teknik sipil .

Hidayat, Taufik (2010) Kajian Evaluasi Kesesuaian Lahan terhadap Tata Ruang Daerah Rawa Pasang Surut, dalam rangka menunjang pengembangan Daerah Rawa di Pulau Rupat. Masters thesis, UNIVERSITAS DIPONEGORO.

HUDA, ALI (2010) ANALISIS PERUBAHAN PERGERAKAN AKIBAT PERUBAHAN INFRASTRUKTUR JALAN LOKAL SEBAGAI DAMPAK PEMBANGUNAN JALAN TOL SEMARANG – SOLO STUDI KASUS KECAMATAN BANYUMANIK KOTA SEMARANG. Masters thesis, UNIVERSITAS DIPONEGORO.

Kistiani, Frida (2010) OPTIMISASI PENDANAAN PROYEK DENGAN TEKNIK PEMROGRAMAN LINIER (Studi Kasus : Proyek-proyek dengan Kontrak Unit Price). Masters thesis, UNIVERSITAS DIPONEGORO.

Lukman, Lukman and Suripin, Suripin and Purwanggono, Bambang (2010) PENGARUH PENERAPAN ISO 9001 TERHADAP KUALITAS PROYEK DI PT. PEMBANGUNAN PERUMAHAN CABANG V WILAYAH JATENG DAN DIY. Masters thesis, magister teknik sipil.

Raharjo, Samsudi (2010) PENGARUH VARIASI TEGANGAN LISTRIK DAN WAKTU PROSES ELEKTROPLATING TERHADAP KETEBALAN SERTA KEKERASAN LAPISAN PADA BAJA KARBON RENDAH DENGAN KROM. Masters thesis, UNIVERSITAS DIPONEGORO.

SUPRIYONO, SUPRIYONO (2010) ANALISIS KINERJA TERMINAL PETIKEMAS DI PELABUHAN TANJUNG PERAK SURABAYA (Studi Kasus Di PT.Terminal Petikemas Surabaya). Masters thesis, UNIVERSITAS DIPONEGORO.

Suwandi, Putri Anggi Permata and Wibowo, Agung and Suharyanto, Suharyanto (2010) KAJIAN MANAJEMEN RESIKO PADA PROYEK DENGAN SISTEM KONTRAK LUMP SUM DAN SISTEM KONTRAK UNIT PRICE (STUDI KASUS PADA PROYEK JALAN DAN JEMBATAN, GEDUNG, BANGUNAN AIR). Masters thesis, magister teknik sipil.

SUWARTO, SUWARTO and Wibowo, Agung and Partono, Windu (2010) OPTIMASI PENJADWALAN TENAGA KERJA PROYEK KONSTRUKSI. Masters thesis, magister teknik sipil.

SUYATNO, SUYATNO (2010) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PROYEK GEDUNG (APLIKASI MODEL REGRESI). Masters thesis, uNIVERSITAS DIPONEGORO.

WIBOWO, HARMAINI (2010) ANALISIS FAKTOR - FAKTOR YANG MEMPENGARUHI WAKTU TUNGGU KAPAL DI PELABUHAN TANJUNG EMAS SEMARANG. Masters thesis, UNIVERSITAS DIPONEGORO.

This list was generated on Sat Apr 20 02:49:35 2024 WIT.