OPTIMISASI PENDANAAN PROYEK DENGAN TEKNIK PEMROGRAMAN LINIER (Studi Kasus : Proyek-proyek dengan Kontrak Unit Price)

KISTIANI, FRIDA (2010) OPTIMISASI PENDANAAN PROYEK DENGAN TEKNIK PEMROGRAMAN LINIER (Studi Kasus : Proyek-proyek dengan Kontrak Unit Price). Masters thesis, UNIVERSITAS DIPONEGORO.

[img]
Preview
PDF - Published Version
734Kb

Abstract

ABSTRACT Construction company often faced project financial problem. Often, construction company difficult to finish the project caused by limited resources (financial properness and payment terms). If construction’s company financial resource is limited, than contractor has to calculate optimum funding for the project. The objectives of this research for applying linier programming in case evaluate contractor’s financing project ability . Benefit which be reached by using linier programming that is contractor would detect the project financial properness, financial alternative and maximum profit. This research analysis four project with unit price contract. Project’s data which collected consist of cash flow, S curve and contract’s rule. Data were analyzed by using linier programming with program TORA. The result of this research indicates by using linier programming contractor would detect the project financial properness, financial alternative should be taken, and maximum profit. This result of this research addressed to benefit all sides. Especially to contractors and projects owner. The advantages which be reached by contractors that is giving ability to detect project financial properness, financial alternative and maximum profit. For projects owner, the project will be finished at time and must be appropriate with contract qualification. Keywords : project financial properness, linier programming, cashflow,TORA,unit price contract, maximum profit (object value)

Item Type:Thesis (Masters)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:School of Postgraduate (mixed) > Master Program in Civil Engineering
ID Code:23970
Deposited By:Mr UPT Perpus 2
Deposited On:11 Nov 2010 12:58