Items where Person is make_name_string expected hash reference

Up a level
Group by: Creators | Item Type | No Grouping
Jump to: B | N | P | S
Number of items: 15.

B

Bachtiar, Arfan and Tri Putranto, Iwan (2009) Pengendalian Kualitas Metode Six Sigma Terintegrasi dengan ISO 9001:2000 (Studi Kasus pada Produk Tali Emas Spesial di PT. Sriboga Raturaya Semarang). Diponegoro University. (Unpublished)

Bachtiar, Arfan and Fanani, Zainal and Nurali, Didik (2009) PERENCANAAN KOMBINASI SHIFT PADA BAGIAN PRODUKSI CV. ANEKA ILMU MENGGUNAKAN INTEGER PROGRAMMING UNTUK MEMINIMALKAN BIAYA TENAGA KERJA. Technical Report. Diponegoro University. (Unpublished)

Bachtiar, Arfan and Saptadi, Singgih and Setiawan, Priyo (2008) Evaluasi Fleksibilitas Rantai Pasok Persahaan (Studi Kasus di PT Coca Cola Bottling Indonesia Central Java). Diponegoro University. (Unpublished)

Bachtiar, Arfan and Hartini, Sri and KARTHA S, RAMA (2008) Feasibility Study Pendirian Industri Pengolahan Susu UHT di Kabupaten Boyolali. Diponegoro University. (Unpublished)

Bachtiar, Arfan and Indirawati, Diana (2007) Analisis Hasil Pengukuran Kinerja Dengan Metode Balanced Scorecard(Studi kasus di Departemen Spinning 4 PT Polysindo Eka Perkasa). Diponegoro Univercity. (Unpublished)

Bachtiar, Arfan and Winanda, Aditya (2007) Analisis Produktivitas dengan Multifactor Productivity Measurement Model(MFPMM)(Studi Kasus pada Unit Paper Mill 6 PT. Pura Barutama Kudus). Diponegoro Univercity. (Unpublished)

Bachtiar, Arfan and Puspitasari, Diana (2004) ANALISA KUALITAS JASA SERVIS SEPEDA MOTOR HONDA DENGAN METODE POTENTIAL GAIN IN CUSTOMER VALUE INDEX. EngD thesis, Diponegoro University.

N

Nugroho, Susatyo and Bachtiar, Arfan and Mariyani, Yuni (2009) PENENTUAN INTEERVAL WAKTU PENGGANTIAN PENCEGAHAN DAN FREKUENSI KEGIATAN PEMERIKSAAN DENGAN KRITERIA MINIMASI DOWNTIME (STUDI KASUS DI PT GE LIGHTING INDONESIA). Diponegoro University. (Unpublished)

P

Prastawa, Heru and Bachtiar, Arfan and Tigor, Jobfi (2009) ANALISA FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PENYIMPANGAN POSISI PIN RING OP3 CYLINDER HEAD DENGAN METODE DISAIN EKSPERIMEN FAKTORIAL (Studi Kasus Astra Daihatsu Motor Engine Plant). Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Flonia, TI (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY DAN GARANSI UNTUKI SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Flonia, TI (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY DAN GARANSI UNTUKI SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Kurniawan, Nur Adi (2009) MODEL PENGGANTIAN SISTEM BERDASARKAN KUMULATIF JUMLAH KERUSAKAN DENGAN MEMPERTIMBANGKAN OPPORTUNITY UNTUK SISTEM DENGAN SIKLUS HIDUP PENDEK. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Zulianti, Rois (2009) OPTIMASI PEMOTONGAN BAHAN DUA DIMENSI DENGAN MENGGUNAKAN PROGRAM LINIER DI PT PORT RUSH SEMARANG. Technical Report. Diponegoro University. (Unpublished)

Purwanggono, Bambang and Bachtiar, Arfan and Abud, Muchamad (2009) PERBAIKAN KUALITAS BODY BUS DENGAN METODE SIX SIGMA (STUDI KASUS PADA PT. LAKSANA KAROSERI). Technical Report. Diponegoro University. (Unpublished)

S

Santoso, Haryo and Bachtiar, Arfan and Fatimah, Laila Isnaina (2009) OPTIMALISASI PENGGUNAAN RUANG KELAS PLARIND BOULEVARD DENGAN PENDEKATAN PROGRAMA LINIER. Technical Report. Diponegoro University. (Unpublished)

This list was generated on Mon May 28 09:36:01 2012 WIT.