Number of items: 7.
Suliantoro, Hery and Adi, Purnawan and Sari, Kurnia (2009) Analisis Pengukuran Kinerja Pengadaan Menggunakan Metode Sink's Seven Performance Criteria (Studi Kasus : Pengadaan P2T Universitas Diponegoro Semarang Tahun 2007). Diponegoro University. (Unpublished)
Prastawa, Heru and Adi, Purnawan and Megawati, Kumala Retno (2009) EVALUASI DAN PERANCANGAN SISTEM KERJA LOADING/UNLOADING (TINJAUAN ASPEK : ERGONOMI) (Studi Kasus di PT Garuda Indonesia Airlines, Bandara Ahmad Yani, Semarang). Technical Report. Diponegoro University. (Unpublished)
Adi , Purnawan and Saptadi, Singgih and Ratna , Mellina (2009) PENENTUAN PRODUCTION LOT SIZES DAN TRANSFER BATCH SIZES DENGAN PENDEKATAN MULTISTAGE. J@TI UNDIP, IV (2). pp. 131-141. ISSN 1907 - 1434
Santoso, Haryo and Adi, Purnawan and Dhani, TI (2009) PENERAPAN MODEL REPLACEMENT SYSTEM UNTUK MENENTUKAN INTERVAL WAKTU PENGGANTIAN MESIN ROLLER PADA PT SANGO CERAMICS INDONESIA DI SEMARANG. Technical Report. Diponegoro University. (Unpublished)
Prastawa, Heru and Adi, Purnawan and Pratiwi, Yuli (2009) PERANCANGAN MEJA KERJA LABORATORIUM ERGONOMI DAN PERANCANGAN SISTEM KERJA TEKNIK INDUSTRI UNDIP. Diponegoro University. (Unpublished)
Nugroho, Susatyo and Adi, Purnawan and Meridiani, Listya (2009) PERANCANGAN ULANG SISTEM DELIVERY SUPPLY (STUDI KASUS DI PT TOYOTA ASTRA MOTOR-ASSY PLANT). Technical Report. Diponegoro University. (Unpublished)
Purwaningsih, Ratna and Adi, Purnawan and Novita, Nora (2009) UPAYA PENINGKATAN PRODUKTIVITAS DENGAN METODE OBJECTIVE MATRIX (OMAX) PADA BAGIAN PRODUKSI DI PT. INDONESIA STEEL TUBE WORKS. Technical Report. Diponegoro University. (Unpublished)
This list was generated on Wed Jun 10 11:03:42 2026 WIT.