Suharyanto, Suharyanto Optimasi Biaya dan Waktu dalam Penyusunan Jadwal Pelaksanaan Proyek (Studi Kasus Proyek Pembangunan Gedung Pusat Kegiatan Mahasiswa Universitas Diponegoro Semarang). UNDIP.
| PDF (Turnitin C9) 1390Kb |
| Item Type: | Other |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Engineering > Department of Civil Engineering Faculty of Engineering > Department of Civil Engineering |
| ID Code: | 80512 |
| Deposited By: | INVALID USER |
| Deposited On: | 03 Apr 2020 11:35 |
| Last Modified: | 03 Apr 2020 11:35 |
Repository Staff Only: item control page

