“ANALISA STABILITAS LERENG DAN ALTERNATIF PENANGANANNYA (STUDI KASUS : JALAN TOL SEMARANG SEKSI A KM-5) “ “alternative analysis of slope stability and handling (case study: Semarang toll road section A MI-5)”

APRILIAN P., ANDY and NURWINADI P., PRAEVIO (2010) “ANALISA STABILITAS LERENG DAN ALTERNATIF PENANGANANNYA (STUDI KASUS : JALAN TOL SEMARANG SEKSI A KM-5) “ “alternative analysis of slope stability and handling (case study: Semarang toll road section A MI-5)”. Undergraduate thesis, F. TEKNIK UNDIP.

[img]PDF
Restricted to Repository staff only

2109Kb
[img]
Preview
PDF
106Kb
[img]
Preview
PDF
101Kb
[img]
Preview
PDF
208Kb
[img]
Preview
PDF
448Kb
[img]
Preview
PDF
380Kb
[img]PDF
Restricted to Repository staff only

591Kb
[img]PDF
Restricted to Repository staff only

599Kb
[img]
Preview
PDF
22Kb
[img]
Preview
PDF
12Kb

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Department of Civil Engineering
Faculty of Engineering > Department of Civil Engineering
ID Code:34313
Deposited By:Mr UPT Perpus 2
Deposited On:03 Mar 2012 11:45
Last Modified:03 Mar 2012 11:45

Repository Staff Only: item control page