PUTRA, AGUNG ANDIKA and HAYUSUDINA, NOVIE DIANING (2006) EFISIENSI TATA LETAK FASILITAS DAN SARANA PROYEK DALAM MENDUKUNG METODE PEKERJAAN KONSTRUKSI ( Studi Kasus Proyek Jakarta City Centre, Sudirman Park, Sudirman Place ). Undergraduate thesis, F. TEKNIK UNDIP.
PDF Restricted to Repository staff only 1802Kb | ||
| PDF 104Kb | |
| PDF 9Kb | |
| PDF 91Kb | |
| PDF 31Kb | |
| PDF 45Kb | |
| PDF 54Kb | |
PDF Restricted to Repository staff only 1520Kb | ||
| PDF 15Kb | |
| PDF 10Kb |
Abstract
Efforts in optimizing construction work have to be started since the prepartion work, in order to achieve an effective and efficient job result in all kind of field. Preparation work is one of the method in construction job. The implementation of it, has a strong connection not only with the field condition but also the type of project that is being carried out. This final assignment report contain one of the activity in preparation work, which is the site plan / site installation design on high rise building. Site plan / site installation is a kind of activity in placing the project facility, that support all kind of method in construction work, in the right place . A site plan design for project facility is an important condition in construction work because it has a strong connection with the efficiency and effectiveness of the construction work. A mistake in site plan / site installation design can cause not only a late in the project, but can also cause an extra cost. Keyword : Construction work, preparation work, site plan, project facility, effective and efficient.
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering Faculty of Engineering > Department of Civil Engineering |
ID Code: | 33828 |
Deposited By: | Mr UPT Perpus 2 |
Deposited On: | 26 Feb 2012 09:01 |
Last Modified: | 26 Feb 2012 09:01 |
Repository Staff Only: item control page