Items where Division is "Faculty of Engineering > Diploma in Ship Building
Faculty of Engineering > Diploma in Ship Building" and Year is 2017

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Creators | Item Type | No Grouping
Number of items: 10.

AZMI, NAFISA LATIFATUL (2017) PERENCANAAN KAPAL IKAN (FISHING VESSEL) “FV.DINA NIAGA” 158 BRT ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.

PRATIWI, CHRISTA DIAN (2017) PERENCANAAN KAPAL IKAN (FISHING VESSEL) “FV. PRATIWI” 132 GT ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.

SITUMORANG, ADITHYA SAMUEL D (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) TB. ”SITUMORANG” 2100 X 2 BHP ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.

SUPARYANTO, BAKTIFAR (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) “TB. ARYAN” 1600 BHP ( BERDASARKAN PERATURAN BKI 2013 ). Undergraduate thesis, undip.

SUPARYANTO, BAKTIFAR (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) “TB. ARYAN” 1600 BHP ( BERDASARKAN PERATURAN BKI 2013 ). Undergraduate thesis, undip.

WICAKSONO, PULUNG (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) “TB. PULUNG” 2 X 2100 BHP ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.

BR SITEPU, WULAN SARI (2017) PERENCANAAN KAPAL TUNDA TB “SITEPU” 2 X 3200 BHP (BERDASARKAN PERATURAN BKI 2013. Undergraduate thesis, undip.

BR SITEPU, WULAN SARI (2017) PERENCANAAN KAPAL TUNDA TB “SITEPU” 2 X 3200 BHP (BERDASARKAN PERATURAN BKI 2013). Undergraduate thesis, undip.

SETIORINI, RAHMANI ISNA I (2017) PERENCANAAN KAPAL IKAN FV. “SETIORINI” 1200 BHP ( BERDASARKAN PERATURAN BKI 2013 ). Undergraduate thesis, undip.

SITUMORANG, ADITHYA SAMUEL D (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) TB. ”SITUMORANG” 2100 X 2 BHP ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.

This list was generated on Sat Apr 20 10:06:45 2024 WIT.