Hasil Turnitin di Proceedings of the International Conference of Logistic and Supply Chain Management System 2016 dengan judul "The Localized Framework of Construction Supply Chain Performance Indicators Based on the SCOR Model"

Agung Wibowo, M. and Bambang Purwanggono, Bambang Hasil Turnitin di Proceedings of the International Conference of Logistic and Supply Chain Management System 2016 dengan judul "The Localized Framework of Construction Supply Chain Performance Indicators Based on the SCOR Model". Departemen Teknik Industri. (Unpublished)

[img]
Preview
PDF - Other
2177Kb

Abstract

Abstract. The main problem in the production of construction projects is the scarcity of material due to the project site is far from the supplier and the ability of suppliers to supply material. Therefore, it needs performance measurementindicators in the construction supply chain to the performance of the supplier. The objective of study is to design and measure the supply chain performance measurement framework with Supply Chain Operations Reference (SCOR) model. The scope of this study is in the road project by conducting questionnaires to the contractor’s project managers and steel and ready mix concrete suppliers. The results showed that the SCOR model can be used as indicators of the construction supply chain performance measurement with the adjustment of operational definitions to applications in construction. Besides, there are two indicators of additional supply chain performance measurement proposed by contractors and suppliers that utilization of information technology and supplier pro-activeness. Design of supply chain performance measurement framework construction of the SCOR model and the additional indicators is done by analyzing similar research that already exists in each of the indicators for determining the maximum value and minimum performance achieved. Scaling performance of each indicator using scale consisting of five scale, 5 scale for excellent, 4 scale for good, 3 scale for average, 2 scale for bad, and 1 scale for bad. The results of the measurement of the performance of the supply chain to suppliers reinforcement steel construction is 4 that good categorie. While the value of supplier of ready mix concrete performance is 4,23 that very good categorie.Keywords:construction supply chain, performance indicator, supplier, SCOR

Item Type:Other
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Department of Industrial Engineering
Faculty of Engineering > Department of Industrial Engineering
ID Code:73266
Deposited By:INVALID USER
Deposited On:14 Jun 2019 11:20
Last Modified:14 Jun 2019 11:20

Repository Staff Only: item control page