Chaniago, Abdul Hamid (2019) PERENCANAAN SISTEM PENGELOLAAN SAMPAH PADA ZONA 1 KABUPATEN REMBANG Studi kasus Kecamatan Rembang, Kecamatan Kaliori, Kecamatan Sumber, Kecamatan Bulu, Kecamatan Sulang. Undergraduate thesis, Universitas Diponegoro.
| PDF 65Kb |
Abstract
ABSTRAK Perencanaan Sistem Pengolahan Sampah pada Zona I Kabupaten Rembang ialah perencanaan pengolahan sampah yang terintegrasi antara pewadahan, pengumpulan, pemilahan, dan pengangkutan dengan mempertimbangkan aspek pengurangan sampah atau 3R. Perencanaan Sistem Pengolahan Sampah Zona I Kabupaten Rembang berpusat pada daerah desa perkotaan sesuai dengan Rencana Pembangunan Jangka Menengah Nasional. Besar timbulan sampah domestik di daerah perencanaan ialah sebesar 2,34 liter/orang/hari. Berdasarkan RPJMN (Rencana Pembangunan Jangka Menengah Nasional) Republik Indonesia tahun 2015-2019 menetapkan bahwa pelayanan perkotaan untuk air bersih, perumahan kumuh dan sanitasi untuk masing-masing ialah sebesar 100%, 0%, dan 100%. Karena pelayanan persampahan merupakan bagian dari sanitasi maka ditetapkan target pelayanan persampahan pada 2019 dan selanjutnya dilengkapi dengan Peraturan Presiden Nomer 97 Tahun 2017 tentang “Kebijakan dan Strategi Nasional Pengelolaan Sampah Rumah Tangga dan Sampah Sejenis Sampah Rumah Tangga” yang membagi tingkat pelayanan kedalam dua bagia yaitu penanganan dan pengurangan dengan target penanganan 70% dan pengurangan 30% pada tahun 2025. Jumlah TPS yan terdapat pada Zona I Kabupaten Rembang berjumlah 27 buah terdiri dari 17 TPS Permukiman dan 10 TPS Non-Permukiman. Secara total tingkat pelayanan persampahan eksisting di Zona I Kabupaten Rembang sebesar 39,42% sehingga perlu diadakan sistem pengolahan sampah untuk meningkatkan sanitasi pada wilayah perencanaan Zona I Kabupaten Rembang, sehingga dapat memenuhi target yang yang berlaku. Kata Kunci : Pengelolaan, Sampah, Limbah Padat, Manajemen Persampahan, Zona I Kabupaten Rembang, Aspek Persampahan ABSTRACT Waste Management System Planning in Zone I of Rembang Regency is an integrated waste management plan between storage, collection, sorting, and transportation taking into account the aspect of waste reduction or 3R. The planning of the Zone I Waste Processing System in Rembang Regency is focus on urban village areas in appropriate with the National Medium Term Development Plan. The amount of domestic waste in the planning area is 2.34 liters / person / day. Based on the Republic of Indonesia National Medium-Term Development Plan (RPJMN) 2015-2019 stipulates that urban services for clean water, dirty housing and sanitation are 100%, 0% and 100% respectively. Because solid waste services are part of sanitation, solid waste service targets are set in 2019 and be equipped by Presidential Regulation Number 97 of 2017 concerning "National Policies and Strategies for Household Waste Management and Household Waste" which divide the service level into two parts, namely handling and reduction with a target of 70% handling and 30% reduction in 2025. The number of TPS found in Zone I of Rembang Regency is 27 units devide of 17 Domestic TPS and 10 Non-Domestic TPS. In total, the existing level of solid waste service in Zone I of Rembang Regency is 39.42%, so a waste management system is needed to improve sanitation in the planning area of Zone I of Rembang Regency, so that it can meet the applicable targets. Keywords : Management, Waste, Solid Waste, Solid Waste Management System, Zone I Of Rembang Regency, Solid Waste Aspect
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | Faculty of Engineering > Department of Environmental Engineering Faculty of Engineering > Department of Environmental Engineering |
ID Code: | 71865 |
Deposited By: | INVALID USER |
Deposited On: | 22 Apr 2019 10:41 |
Last Modified: | 22 Apr 2019 10:41 |
Repository Staff Only: item control page