Susanto, Novie and Aziz, Damar Analisis turn around time (TAT) pada proses pooling komponen pesawat: Studi kasus keterlambatan pengembalian komponen pesawat CRJ 1000 nextgen di PT. GAA_Peer Review. Peer Review. (Unpublished)
Full text not available from this repository.
Item Type: | Other |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering > Department of Industrial Engineering Faculty of Engineering > Department of Industrial Engineering |
ID Code: | 69748 |
Deposited By: | INVALID USER |
Deposited On: | 20 Feb 2019 14:27 |
Last Modified: | 13 Jul 2020 11:11 |
Repository Staff Only: item control page