Analisis turn around time (TAT) pada proses pooling komponen pesawat: Studi kasus keterlambatan pengembalian komponen pesawat CRJ 1000 nextgen di PT. GAA_Turnitin

Susanto, Novie and Aziz, Damar Analisis turn around time (TAT) pada proses pooling komponen pesawat: Studi kasus keterlambatan pengembalian komponen pesawat CRJ 1000 nextgen di PT. GAA_Turnitin. https://www.turnitin.com/. (Unpublished)

Full text not available from this repository.


Item Type:Other
Subjects:T Technology > T Technology (General)
Divisions:Faculty of Engineering > Department of Industrial Engineering
Faculty of Engineering > Department of Industrial Engineering
ID Code:69745
Deposited By:INVALID USER
Deposited On:20 Feb 2019 14:25
Last Modified:13 Jul 2020 11:10

Repository Staff Only: item control page