Risk analysis of BOT scheme on post-construction toll road (HASIL REVIEW)

Hario SETIADJI, Bagus Risk analysis of BOT scheme on post-construction toll road (HASIL REVIEW). -. (Unpublished)

[img]PDF (Risk analysis of BOT scheme on post-construction toll road (HASIL REVIEW))
Restricted to Registered users only

1601Kb

Item Type:Other
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Department of Civil Engineering
Faculty of Engineering > Department of Civil Engineering
ID Code:65751
Deposited By:INVALID USER
Deposited On:08 Oct 2018 15:25
Last Modified:08 Oct 2018 15:25

Repository Staff Only: item control page