Penerapan Model Persediaan dengan Pertimbangan Variabilitas Lead Time Material Methanol (Studi Kasus : PT. Pupuk Kalimantan Timur)

Hartini, Sri and Puspita Sari, Diana and Sulistyanto, Adhy (2009) Penerapan Model Persediaan dengan Pertimbangan Variabilitas Lead Time Material Methanol (Studi Kasus : PT. Pupuk Kalimantan Timur). Diponegoro University. (Unpublished)

Full text not available from this repository.

Abstract

PKT merupakan perusahaan pupuk yang beroperasi di Bontang, Kalimantan Timur. PKT memiliki berbagai jenis material chemical yang digunakan dalam proses produksi. Methanol merupakan material chemical paling penting pada perusahaan. Tetapi, pemesanan yang dilakukan saat ini tidak memperhatikan ketidakpastian dalam lead time. Akibatnya terjadi pembelian ekstra dengan harga material jauh lebih tinggi bila ketidakpastian tersebut “merusak” perencanaan awal perusahaan. Penelitian ini memfokuskan pada kebijakan persediaan alternatif yang mempertimbangkan ketidakpastian dalam lead time dengan tujuan meminimasi biaya total persediaan. Dari hasil data penelitian yang dikumpulkan dan diolah, didapatkan hasil bahwa biaya total persediaan model usulan dengan Model Sphicas&Nasri lebih kecil, yaitu sebesar Rp 1.653.465.088 dibandingkan dengan biaya total model awal perusahaan yang telah diterapkan selama ini, yaitu sebesar Rp 3.193.712.246. Kata Kunci : model persediaan, biaya total persediaan, ketidakpastian lead time PKT is fertilizer company operating in Bontang, East Kalimantan. PKT have used various chemical material type in production process. Methanol is most important chemical material at company. But, ordering system in this time haven’t consideration of uncertainty in lead time. As a consequence, it made purchasing extra with the price of material much higher when the uncertainty “destroy” planning of company. This reserach have focus at alternative policy of supply which considering uncertainty in lead time with a purpose to minimize total inventory cost. From result of collected research data and processed, to be got by result of that total inventory cost of proposal model with Model Sphicas&Nasri is smaller than total inventory cost existing model. Total inventory cost of proposal model is equal to Rp 1.653.465.088 and total inventory cost of existing model is equal to Rp 3.193.712.246. Keywords : inventory, model, total inventory cost, uncertainty of lead time

Item Type:Other
Subjects:T Technology > TP Chemical technology
Divisions:Faculty of Engineering > Department of Industrial Engineering
Faculty of Engineering > Department of Industrial Engineering
ID Code:6294
Deposited By:INVALID USER
Deposited On:02 Feb 2010 11:21
Last Modified:02 Feb 2010 11:23

Repository Staff Only: item control page