WICAKSONO, PULUNG (2017) PERENCANAAN KAPAL TUNDA (TUG BOAT) “TB. PULUNG” 2 X 2100 BHP ( BERDASARKAN PERATURAN BKI 2014 ). Undergraduate thesis, undip.
| PDF (COVER) 14Kb | |
| PDF (DAFTAR ISI) 85Kb | |
| PDF (BAB I) 93Kb | |
| PDF (BAB II) Restricted to Repository staff only 812Kb | ||
| PDF (BAB III) Restricted to Repository staff only 821Kb | ||
| PDF (BAB V) Restricted to Repository staff only 124Kb | ||
| PDF (BAB VI) Restricted to Repository staff only 650Kb | ||
| PDF (BAB VII) 29Kb |
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
| Divisions: | Faculty of Engineering > Diploma in Ship Building Faculty of Engineering > Diploma in Ship Building |
| ID Code: | 60316 |
| Deposited By: | INVALID USER |
| Deposited On: | 31 Jan 2018 09:52 |
| Last Modified: | 31 Jan 2018 09:52 |
Repository Staff Only: item control page

