PEMBANGUNAN JALAN AKSES GEDE BAGE Main Road (STA 5+560 – STA 6+280), Ramp 1 (STA 0+000 – STA 1+323) dan Ramp 8 (STA 0+000 – STA 0+828) BANDUNG, JAWA BARAT

Yunita, Tiya Dwi (2016) PEMBANGUNAN JALAN AKSES GEDE BAGE Main Road (STA 5+560 – STA 6+280), Ramp 1 (STA 0+000 – STA 1+323) dan Ramp 8 (STA 0+000 – STA 0+828) BANDUNG, JAWA BARAT. Undergraduate thesis, undip.

[img]
Preview
PDF (COVER ,KATA PENGANTAR,DAFTAR ISI)
54Kb
[img]
Preview
PDF (BAB I)
42Kb
[img]PDF (BAB II )
Restricted to Repository staff only

1584Kb
[img]PDF (BAB III )
Restricted to Repository staff only

7Mb
[img]
Preview
PDF (BAB IV)
38Kb

Abstract

Internship report discusses the results of the activities of the intern with a case study of the PEMBANGUNAN JALAN AKSES GEDE BAGE Main Road (STA 5+560 – STA 6+280), Ramp 1 (STA 0+000 – STA 1+323) and Ramp 8 (STA 0+000 – STA 0+828)BANDUNG, West Java. The collection of data used is direct field observations, interviews, shop drawing, data and projects written study of the literature. Basically the type of Foundation used in this project is the Foundation of powerboats that are staking with AIDS construction of Diesel Hammer and Hydraulic Static Pile Driving (HSPD). From the results of this report are obtained understanding of two construction tools, productivity, methods of work, as well as the advantages and disadvantages of each tool construction. KeyWords: Stacking tools, the Diesel Hammer, Hydraulic Static Pile Driving (HSPD), productivity, work methods, advantages and disadvantages

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Diploma in Civil Engineering
Faculty of Engineering > Diploma in Civil Engineering
ID Code:59745
Deposited By:INVALID USER
Deposited On:22 Jan 2018 08:49
Last Modified:22 Jan 2018 08:49

Repository Staff Only: item control page