Rihandoyo, Rihandoyo (2015) Evaluasi Rencana Kerja Satuan Kerja Perangkat Daerah Dinas Koperasi,Usaha Mikro,Kecil dan Menengah Pemerintah Kota Semarang. DIALOGUE . ISSN 1693-8399
| PDF 3434Kb |
Abstract
Development planning is onepart early in the development rycle. While the evaluation of development is the final part of a development cycle. Evaluation is very necessary in order to see whether the development has reached the target thathad been planned. Regulation on the planning and evaluation of the pembanunan is Government Regulation No. 8 of 2008 and Regulation No.54 Year 2010 regarding Stages,Procedures Preparation,Control and Evaluation of the Implementation Plan for Regional Development. Regional Office of Cooperative,Micro,Small and Medium Enterprises (Dinkopumkm) Semarang city as part of government required to ormulate and implement development evaluation. Evaluation is governed by Article 46 of Government Regulation No. 8 of 2008 includes an evaluation of the policy of regional development planning, implementation of local development plans and the resuts of local development plans. Results of the evaluation are Dinkop UMKM Semarang Evaluation Policy Formulation Work Plan Semarang City Department of Cooperatives SMEs Have generally been contructed in accordance with existing regulation. Synchronization policy on the Vision, Mission, Goals and Objectives of the Strategic plan and working plan UMKM Department. In 2013 the fourth offical program has far proceeded the targets set. Uptake of the budget in 2013 there is only the program that absorption reaching more than 100%.
Item Type: | Article |
---|---|
Subjects: | H Social Sciences > H Social Sciences (General) |
Divisions: | Faculty of Social and Political Sciences > Department of Public Administration |
ID Code: | 57946 |
Deposited By: | INVALID USER |
Deposited On: | 03 Nov 2017 11:42 |
Last Modified: | 03 Nov 2017 11:42 |
Repository Staff Only: item control page