ANALISIS KEBUTUHAN DAYA LISTRIK TIGA FASA UNTUK PENJADWALAN DISTRIBUSI BEBAN

UTOMO, Kusno and Suryono, Suryono and Suseno, Jatmiko Endro (2017) ANALISIS KEBUTUHAN DAYA LISTRIK TIGA FASA UNTUK PENJADWALAN DISTRIBUSI BEBAN. Masters thesis, School of Postgraduate.

[img]PDF
Restricted to Repository staff only

955Kb

Abstract

Kebutuhan terhadap beban tenaga listrik sangat tergantung pada perubahan aktivitas manusia sehari-hari yang diikuti perputaran penggunaan beban listrik mingguan dan bulanan. Tuntutan kebutuhan beban tinggi umumnya pada siang hari dan rendah ketika malam hari. Untuk memenuhi kebutuhan beban listrik yang cukup dan memenuhi permintaan beban puncak perlu dilakukan analisa beban kebutuhan listrik dan proses penentuan penjadwalan masing-masing unit pada waktu tertentu sehingga menghasilkan beban listrik yang optimal. Data pengukuran pemakaian beban pada masing-masing gedung atau unit cenderung tidak seimbang, dalam satu hari arus maksimum pada fasa R dapat mencapai 113 A., sedang pada fasa S mencapai 124 A., dan pada fasa T mencapai 103 A. Sedang arus minimumnya untuk fasa R 75 A., pada fasa S 80 A., dan pada fasa T 65 A. data tersebut dikelompokan, kemudian ditabulasi dan di olah dengan spreadsheet, kemudian diolah secara penuh dijalankan pada komputer menggunakan program aplikasi Matlab. Termasuk didalamnya terdapat proses fuzzy sebagai penyelaras hasil agar didapatkan hasil perhitungan beban yang seimbang dengan harapan beban pada fasa R sebesar 94 A., pada fasa S sebesar 102 A., dan pada fasa S sebesar 84 A. Dengan GUI (Graphic User Interface) di mana dalamnya terdapat dua buah file Figure dan M-Script. File Figure berfungsi sebagai User Interface dari komputasi yang ditulis pada M-Script. Dengan demikian tampilan hasil pengukuran pemakaian saat tidak seimbang beban dan rekomendasi agar pemakaian beban seimbang dapat secara langsung diketahui. Kata kunci : beban tenaga listrik, fuzzy, beban seimbang The need for electric power load is highly dependent on changes in human activities of daily turnover followed by the use of electrical loads weekly and monthly. Generally demands high load during the day and low during night. To meet the needs of the electrical load enough and meet peak load demand necessary to analyze load electricity needs and the process of determining the scheduling of each unit at a certain time so as to produce an optimal electrical load. Measurement data usage load on each building or unit tend to be unbalanced, one day maximum current on phase R can reach 113 A., being in S phase reaches 124 A., and the T-phase current of 103 A. being the minimum for 75 A. R phase, the S phase 80 A, and on the phase T 65 A. the data is grouped, then tabulated and if the spreadsheet, then processed in full run on computers using Matlab application program. Included therein are fuzzy process as aligning the results in order to obtain a balanced load calculation results with the expectations of the load on the phase R of 94 A., at S phase by 102 A., and the S phase of 84 A. With a GUI (Graphic User Interface) in which it there are two files Figure and M-Script. File Figure serves as a user interface of the computing written on M-Script. Thus the use of display measurement results when an unbalanced load and the recommendation that the use of load balancing can be directly known. Keywords: electric power loads, fuzzy, load balanced

Item Type:Thesis (Masters)
Subjects:Q Science > QA Mathematics > QA75 Electronic computers. Computer science
Divisions:School of Postgraduate (mixed) > Master Program in Information System
ID Code:56097
Deposited By:INVALID USER
Deposited On:14 Sep 2017 15:09
Last Modified:14 Sep 2017 15:09

Repository Staff Only: item control page