Hutomo, Dimas Ferlindra and Murni, Murni (2015) ANALISA KEBUTUHAN UDARA UNTUK PEMBAKARAN SEMPURNA PADA BOILER UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ( ANALYSIS OF AIR NEEDED FOR COMPLETE COMBUSTION IN UNIT 1 PLTU 3 JAWA TIMUR TANJUNG AWAR – AWAR TUBAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Mesin Fakultas Teknik.
| PDF 49Kb | |
| PDF 20Kb | |
| PDF 136Kb | |
PDF Restricted to Repository staff only 286Kb | ||
PDF Restricted to Repository staff only 110Kb | ||
| PDF 44Kb |
Abstract
Boiler merupakan bagian paling penting bagi kelangsungan kerja Pembangkit Listrik Tenaga Uap (PLTU). Boiler melakukan pembakaran guna menciptakan uap bertekanan yang digunakan untuk memutarkan turbin uap. Pembakaran di dalam boiler ini sebaiknya berlangsung secara sempurna agar dapat meningkatkan nilai efektifitas kerja PLTU dan menghemat biaya operasional dari bahan bakar yang digunakan. Tujuan dari analisa ini adalah untuk mengetahui rasio kebutuhan udara yang sesuai agar pembakaran sempurna dapat terjadi di dalam ruang bakar. Kondisi yang terjadi saat ini, operator belum mempunyai titik angka yang menjadi acuan untuk pembakaran sempurna dapat terjadi di dalam ruang bakar. Hal ini sangat penting mengingat pasokan kebutuhan udara yang beracuan pada pencapaian suhu dan tekanan di ruang bakar sangat tidak efisien. Pengambilan data yang dilaksanakan dalam skala beban 50% - 100% untuk mengetahui kebutuhan udara pada setiap manipulasi beban dan dampaknya terhadap peralatan pendukung boiler lainnya. Kata kunci : kebutuhan udara pembakaran, ruang bakar boiler, pembakaran sempurna Boiler is the most important for continious work of Steam Power (power plant). Boiler combustion creating steam pressure and it is use to rotate the steam turbine. Boiler complete combustion should be did perfectly in order to increase the effectiveness value of the power plant and to decrease operating costs of the fuel used. The purpose of this analysis is to determine the appropriate ratio of air requirements so that complete combustion can occur in furnace. At this point, the operator does not have a reference point for complete combustion can occur in furnace. This is important because, if supply of air requirements that has reference point on temperature and pressure reach out in furnace is very inefficient. Data collecting is performed in the scale of 50% - 100% load to determine the air requirements at any manipulation of the load and the impact on other boiler auxilliary equipment. Keyword : combustion air needed, furnace, complete combustion
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Faculty of Engineering > Diploma in Mechanical Engineering Faculty of Engineering > Diploma in Mechanical Engineering |
ID Code: | 46874 |
Deposited By: | INVALID USER |
Deposited On: | 20 Nov 2015 15:08 |
Last Modified: | 20 Nov 2015 15:08 |
Repository Staff Only: item control page