ANALISA UNJUK KERJA KONDENSOR UNIT II TIPE N – 16000 DI PLTU I JAWA TIMUR PACITAN ( CONDENSER PERFORMANCE ANALYSIS UNIT II TYPE N - 16000 IN PLTU I JAWA TIMUR PACITAN )

Triwijayanta, Bayu and Sutrisno, Sutrisno (2014) ANALISA UNJUK KERJA KONDENSOR UNIT II TIPE N – 16000 DI PLTU I JAWA TIMUR PACITAN ( CONDENSER PERFORMANCE ANALYSIS UNIT II TYPE N - 16000 IN PLTU I JAWA TIMUR PACITAN ). Undergraduate thesis, D3 Kerjasama PT. PLN Bidang Teknik Mesin.

[img]
Preview
PDF
140Kb
[img]
Preview
PDF
32Kb
[img]PDF
Restricted to Repository staff only

240Kb
[img]PDF
Restricted to Repository staff only

382Kb
[img]PDF
Restricted to Repository staff only

378Kb
[img]
Preview
PDF
18Kb

Abstract

PLTU 1 Jawa Timur - Pacitan adalah sebuah pembangkit listrik dengan tenaga Uap yang menggunakan bahan bakar batubara berkalori rendah dengan daya terpasang sebesar 2x315 MW. PLTU 1 Jawa Timur Pacitan ini terdiri dari berbagai komponen utama dan komponen pendukung. Salah satu komponen pendukung yang keberadaannya harus selalu aktif di PLTU adalah Kondensor. Kondensor berfungsi untuk mengkondensasikan uap dari low pressure turbine menjadi air condensate. Tugas ini bertujuan untuk menganalisa unjuk kerja dari kondensor Unit 2 PLTU 1 Jawa Timur Pacitan.Dengan mencari koefisien perpindahan panas pada saat beban 300 MW. Hasil analisa data kondisi unit masih baru masih baru dengan unit telah lama beroperasidapat di ketahui bahwa kondensor unit 2 beban 300MW kondisi Ueff 1540 W/ m2 oK sedangkan bulan januari Ueff bernilai 970 W/ m2 oK , bulan februari Ueff951W/ m2 oK, dan bulan maret Ueff bernilai 884 W/ m2 oK. PLTU 1 Jawa Timur Pacitan is a Steam power plants that use low-calorie coal fuel with an installed power of 2x315 MW. PLTU 1 Jawa Timur Pacitan consists of various major components and supporting components. One of the supporting components whose existence must always be active in the power plant is the condenser. The condenser is used to condense steam from the low pressure turbine into condensate water. This task aims to analyze the performance of the condenser Unit 2 PLTU 1 Jawa Timur Pacitan. By looking for the heat transfer coefficient when the load of 300 MW. The results of the data analysis unit was new condition still new with the old units had been operating can know that the condenser unit 2 300MW load condition Ueff1540 W / m2oK while in January Ueff worth 970 W / m2oK, in February Ueff 951 W / m2oK, and in March Ueff worth of 884 W / m 2oK.

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TJ Mechanical engineering and machinery
Divisions:Faculty of Engineering > Diploma in Mechanical Engineering
Faculty of Engineering > Diploma in Mechanical Engineering
ID Code:44884
Deposited By:INVALID USER
Deposited On:17 Dec 2014 09:46
Last Modified:17 Dec 2014 09:46

Repository Staff Only: item control page