Hartono, Hartono and Widodo, Puji (2014) MANAJEMEN PENYEBAB TERJADINYA KELAMBATAN PELAKSANAAN KONSTRUKSI BANGUNAN DI DINAS PEKERJAAN UMUM KOTA SEMARANG. In: Seminar Nasional Inovasi Pembangunan Pelabuhan di Indonesia, 15 September 2014, Kampus UNDIP Semarang.
| PDF - Published Version 541Kb |
Abstract
The implementation of the construction of a building construction field are influenced by several factors , ranging from an initiative or idea , the planning and execution of a construction pembanguanan . A lot of building construction projects are affected by planning consultants, contractors and supervising consultants lapangan.Tujuan of this study was to determine what factors influence the occurrence of a delay in work execution of building projects , especially in the Department of Public Works Semarang . The research data is using interviews and questionnaires as primary data are then processed using SPSS 12. The primary data is drawn at random from the consultants and contractors working on the project in Semarang City Public Works Department . In conclusion , the cause of the delay in the execution of building construction in the city of Semarang is 1. The method of execution is bad . 2. Lack of manpower . 3. Bad weather ( heavy rain inundated locations ) . 4. Mismanagement of material . 5. Errors planning and specification . 6. Mobilization tool ugly . From the results of this study are expected to interested stakeholders can reduce the things mentioned above , so that the construction work can be run as planned .
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Keywords : Construction Management . |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Diploma in Civil Engineering Faculty of Engineering > Diploma in Civil Engineering |
ID Code: | 44197 |
Deposited By: | INVALID USER |
Deposited On: | 06 Nov 2014 12:08 |
Last Modified: | 06 Nov 2014 12:08 |
Repository Staff Only: item control page