Hartono, Hartono and Lukman, Lukman (2013) PENGARUH ASPEK PELAKSANAAN KONSTRUKSI TERHADAP KINERJA WAKTU PROYEK (STUDI KASUS DI DINAS CIPTA KARYA PROVINSI JAWA TENGAH). TEKNIK , 34 (1). pp. 47-51. ISSN 0852-1697
| PDF - Published Version 535Kb |
Official URL: http://ejournal.undip.ac.id
Abstract
Atexcution process of a project of construction of building development, start from idea of up to finising of a project, will always influenced by previous activity, that is start from idea and planing which have been planned, as its execution guidane, proses the execution , will be related/relevant always with the expense, time and quality from itself construction. For that presumably require to perform of research for the problem of execution time of a project. This research target is to know the relation among execution of construction project to performent of project expense, and performance of project time. This research is expected by by be of benefit to serve service, and direct related other party with the project organizer, so that project performance of below On duty Create the Masterpiece and Planology of Province of Central Java and improved later on day. Fron data analysis abtained : Make-Up of amount and appliance condition used for the work of especial, execution method work, and draw the execution, will improve the time performence.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Management Construction |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Diploma in Civil Engineering Faculty of Engineering > Diploma in Civil Engineering |
ID Code: | 44193 |
Deposited By: | INVALID USER |
Deposited On: | 05 Nov 2014 12:49 |
Last Modified: | 05 Nov 2014 12:49 |
Repository Staff Only: item control page