SWASTIKA A, ANGGIT and MISAEL W, HENDY (2009) “ PENERAPAN CRITICAL PATH METHOD (CPM), PRECEDENCE DIAGRAM METHOD (PDM) DAN LINE OF BALANCE (LoB) PADA PEKERJAAN REPETITIF VERTIKAL DAN HORIZONTAL ”. Undergraduate thesis, F. TEKNIK UNDIP.
PDF Restricted to Repository staff only 901Kb | ||
| PDF 28Kb | |
| PDF 63Kb | |
| PDF 16Kb | |
| PDF 234Kb | |
| PDF 63Kb | |
PDF Restricted to Repository staff only 31Kb | ||
PDF Restricted to Repository staff only 463Kb | ||
PDF Restricted to Repository staff only 138Kb | ||
| PDF 25Kb |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering Faculty of Engineering > Department of Civil Engineering |
ID Code: | 34331 |
Deposited By: | Mr UPT Perpus 2 |
Deposited On: | 03 Mar 2012 13:25 |
Last Modified: | 03 Mar 2012 13:25 |
Repository Staff Only: item control page