ANALISA WASTE TENAGA KERJA KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT (Analysis of Waste of Construction Labour on Low Rise Building Projects)

PRASETYO, M. ARIE and SEPTIAN AS, SEPTIAN AS (2010) ANALISA WASTE TENAGA KERJA KONSTRUKSI PADA PROYEK GEDUNG BERTINGKAT (Analysis of Waste of Construction Labour on Low Rise Building Projects). Undergraduate thesis, F. TEKNIK UNDIP.

[img]PDF
Restricted to Repository staff only

1399Kb
[img]
Preview
PDF
28Kb
[img]
Preview
PDF
41Kb
[img]
Preview
PDF
54Kb
[img]
Preview
PDF
66Kb
[img]
Preview
PDF
165Kb
[img]
Preview
PDF
156Kb
[img]PDF
Restricted to Repository staff only

778Kb
[img]PDF
Restricted to Repository staff only

353Kb
[img]
Preview
PDF
53Kb
[img]
Preview
PDF
45Kb

Abstract

Segala sesuatu di dalam suatu proyek yang tidak menambah nilai disebut dengan pemborosan (waste), contohnya produksi yang berlebihan, pengerjaan ulang, pergerakan orang atau material yang tidak perlu dan lain sebagainya. Penelitian ini dilakukan pada proyek-proyek gedung bertingkat dan bertujuan untuk mengetahui faktor-faktor utama penyebab ketidakefetifan tenaga kerja konstruksi serta upaya pencegahannya. Metode yang digunakan dalam penelitian ini yaitu observasi, wawancara dan studi pustaka. Proses pengamatan dilakukan terhadap bidang pekerjaan pembesian, pekerjaan kayu dan pasangan bata. Dari data-data hasil pengamatan didapatkan prosentase rata-rata terjadinya waste tukang pembesian sebesar 19%, waste tukang kayu sebesar 8,6% dan waste tukang pasangan bata sebesar 10,4%. Mayoritas waste yang terjadi adalah akibat perilaku. Beberapa faktor yang mempengaruhi terjadinya waste pada saat bekerja antara lain adalah kurangnya pengawasan, peralatan bantu yang kurang memadai, tidak efektifnya jumlah tenaga kerja dalam suatu area kerja serta keterbatasan pengalaman kerja para tukang.. Kata kunci : waste, tenaga kerja, gedung bertingkat, ketidakefektifan, perilaku. xiii ABSTRACT Everything on the construction project that do not add values is called waste, e.g. over production, rework, unnecessary movement of people or material, etc. This research was carried out on low rise building projects and aims to identify major factors that cause labours ineffectiveness and the preventions. Research methods includes observation, interview and literature review. The observation is was done on steelwork, carpentry and bricklaying trades. The results show the average of waste on steelworkers, carpenters and bricklayers are 19%, 8,6% and 10,4% respectively, most of which is caused by behavior. Factors identified which can cause waste are lack of supervision, unavailability of equipment, excessive or shortage of labours on site and lack of work experience of the labours. Key words : waste, labours, low rise building, ineffectiveness, behavior.

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Department of Civil Engineering
Faculty of Engineering > Department of Civil Engineering
ID Code:34305
Deposited By:Mr UPT Perpus 2
Deposited On:03 Mar 2012 10:57
Last Modified:03 Mar 2012 10:57

Repository Staff Only: item control page