YUDAKUSUMAH, TEGUH and WARDHANI, SILVIA KUSUMA (2008) TUGAS AKHIR OPTIMASI WAKTU DAN BIAYA PADA JARINGAN KERJA CRITICAL PATH METHOD (CPM) DAN PRECEDEN DIAGRAM METHOD (PDM) ( Studi Kasus Rumah Susun Sederhana Sewa ( RUSUNAWA ), Kab. Karanganyar ). Undergraduate thesis, F. TEKNIK UNDIP.
PDF Restricted to Repository staff only 675Kb | ||
| PDF 29Kb | |
| PDF 67Kb | |
| PDF 20Kb | |
| PDF 115Kb | |
| PDF 51Kb | |
| PDF 293Kb | |
| PDF 36Kb | |
PDF Restricted to Repository staff only 135Kb | ||
PDF Restricted to Repository staff only 18Kb | ||
| PDF 20Kb | |
| PDF 9Kb |
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering Faculty of Engineering > Department of Civil Engineering |
ID Code: | 33969 |
Deposited By: | Mr UPT Perpus 2 |
Deposited On: | 28 Feb 2012 10:41 |
Last Modified: | 28 Feb 2012 10:41 |
Repository Staff Only: item control page