PERENCANAAN SISTEM DEWATERING PADA RENCANA PELAKSANAAN PEMBANGUNAN BENDUNG GERAK TULIS, BANJARNEGARA – JAWA TENGAH

PRIYONO, PRIYONO and INDRASYAHPUTRA, RICKY (2007) PERENCANAAN SISTEM DEWATERING PADA RENCANA PELAKSANAAN PEMBANGUNAN BENDUNG GERAK TULIS, BANJARNEGARA – JAWA TENGAH. Undergraduate thesis, F. TEKNIK UNDIP.

[img]
Preview
PDF
12Kb
[img]PDF
Restricted to Repository staff only

20Mb
[img]
Preview
PDF
4Mb
[img]
Preview
PDF
143Kb
[img]
Preview
PDF
214Kb
[img]
Preview
PDF
46Kb
[img]
Preview
PDF
491Kb
[img]
Preview
PDF
699Kb
[img]
Preview
PDF
1727Kb
[img]
Preview
PDF
347Kb
[img]PDF
Restricted to Repository staff only

280Kb
[img]PDF
Restricted to Repository staff only

434Kb
[img]
Preview
PDF
51Kb
[img]
Preview
PDF
12Kb

Abstract

Daerah Konstruksi Bendung γ = 2,42 t/m3 γ sat = 2,49 t/m3 c = 0,42 t/m2 ǿ1 = 350 σ = 2,49 t/m3 Daerah Lereng / Tebing 􀂃 Lapis 1(Elevasi > +680.00) : γ1 = 1,67 t/m3 ǿ1 = 260 c 1= 4,00 t/m2 􀂃 Lapis 2 (Elevasi 680.00 – 670.00) : γ2 = 1,77 t/m3 ǿ2 = 17,500 c2 = 4,50 t/m2 􀂃 Lapis 3 (Elevasi < +670.00) : γ3 = 2,02 t/m3 ǿ3 = 350 c3 = 5,00 t/m2

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Divisions:Faculty of Engineering > Department of Computer System
Faculty of Engineering > Department of Computer System
ID Code:33846
Deposited By:Mr UPT Perpus 2
Deposited On:26 Feb 2012 11:23
Last Modified:26 Feb 2012 11:23

Repository Staff Only: item control page