Ashari , Saiful (1995) Pengujian dan penerapan meter listrik atau kwh - meter arus bolak-balik dengan metode beban waktu. Undergraduate thesis, FMIPA UNDIP.
PDF Restricted to Repository staff only 2170Kb | ||
| PDF 29Kb | |
| PDF 337Kb | |
| PDF 418Kb | |
| PDF 389Kb | |
| PDF 1204Kb | |
| PDF 355Kb | |
PDF Restricted to Repository staff only 567Kb | ||
| PDF 348Kb | |
| PDF 328Kb | |
| PDF 568Kb |
Abstract
ABSTRACT It has done tested and calibrated of kWh-meters one phase induction with time load methode. On this test is be find, time for n rotation of kWh-meters disk what be measure with stormatch and then this error can be find. On calibration for current, 100 % nominal current, power factor 1,0 controle was be doing on magnetic brake. On current 100 % nominal current, power factor 0,5 inductive controle was be doing on instrument of power factor controle. On current 5 % nominal current, power factor 1.0 controle on instrument of low load controle. Telah dilakukan pengujian dan peneraan kWh-meter tipe induksi sate fase dengan metode beban waktu. Pada pengujian ini didapatkan waktu yang diperlukan untuk n putaran piringan kWh-meter yang diukur dengan stopwatch dan selanjutnya dapat dicari kesalahannya. Pada peneraan untuk arus 100 % arus nominal, faktor daya 1,0 pengaturan dilakukan pada rem magnet. Pada arus 100% arus nominal, faktor daya 0,5 induktif pengaturan dilakukan pada alat pengatur faktor daya. Pada arus 5% arus nominal, faktor daya 1,0 pengaturan pada alat pengatur beban rendah.
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | Q Science > QC Physics |
Divisions: | Faculty of Science and Mathematics > Department of Physics |
ID Code: | 30226 |
Deposited By: | Mr UPT Perpus 1 |
Deposited On: | 24 Oct 2011 13:06 |
Last Modified: | 24 Oct 2011 13:06 |
Repository Staff Only: item control page