ESTIMASI BIAYA PEMBUATAN PERANGKAT LUNAK MENGGUNAKAN METODE COCOMO II PADA SISTEM INFORMASI PELAPORAN KEGIATAN PEMBANGUNAN

Primaraka, Aderian and Handoyo, Eko and Isnanto, R.Rizal (2011) ESTIMASI BIAYA PEMBUATAN PERANGKAT LUNAK MENGGUNAKAN METODE COCOMO II PADA SISTEM INFORMASI PELAPORAN KEGIATAN PEMBANGUNAN. Undergraduate thesis, Jurusan Teknik Elektro Fakultas Teknik Undip.

[img]
Preview
PDF - Published Version
161Kb

Abstract

Nowadays, software is absolutely important for individual or company in many matters. Software design or development is done based on future or certain condition. So, it is important to understand these conditions to calculate cost and duration of a software project. This research discusses on cost estimation method of software project, this is COCOMO II (Constructive Cost Model). COCOMO II has three submodels i.e. Application Composition, Early Design, and Post Architecture, which has a possibility to estimate in less or complete condition of information. By using this COCOMO II estimation model, total efforts being needed to complete a software project in person month and total duration of processing or developing in month can be known. By adapting project standard value in the area with certain time, nominal value of a software project can be determined. Study case completed in Development Activity Report Information System, gives a conclusion that COCOMO II method is suitable to calculate cost (effort) and schedule (time) estimation. Size used as basic calculation is SLOC (Source Line Of Code). In this research, SLOC is determined by calculating UFP (Unadjusted Function Points), while SLOC is determined by calculating the number of source code line of the former project. Keywords : Software Cost Estimation, COCOMO II, Post Architectu

Item Type:Thesis (Undergraduate)
Subjects:T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions:Faculty of Engineering > Department of Electrical Engineering
Faculty of Engineering > Department of Electrical Engineering
ID Code:25494
Deposited By:INVALID USER
Deposited On:13 Jan 2011 09:53
Last Modified:13 Jan 2011 09:53

Repository Staff Only: item control page